Free planning and quantity tools for office interiors, facades and building services: office space, seats, meeting rooms, lighting, AC tonnage, ventilation, ducts, DG and UPS sizing, water and pumps, glazing, ceilings, partitions, flooring and more. Every result is shown instantly, with the formula and editable assumptions behind it.
DG set sizing works out the kVA rating a diesel generator needs to carry a building's backup load. A screening calculation converts the running load to kVA, adds an expansion margin, keeps the set below its maximum continuous loading, checks the peak when the largest motor starts, and rounds up to the next common rating.
Duct sizing by the velocity method divides the airflow by a chosen air velocity to get the duct's cross-sectional area, then turns that area into a round diameter or a rectangular width and height. A lower velocity gives a larger, quieter duct; a higher one gives a smaller duct with more noise and more pressure loss.
A facade glazing take-off divides a curtain wall into its repeating modules, then measures the vision glass people look through and the opaque spandrel that hides each slab edge. Those two areas give the window-to-wall ratio, the number of glass units and spandrel panels, and the sealant run around the glass.
A meeting room is sized from the table outwards. The number of seats along each side sets the table length, the clearance needed to pull a chair out and walk behind it sets the space around the table, and a zone at the screen end leaves room for the display. Add them up and you have the inside dimensions of the room.
An office seat capacity calculation starts from a known carpet area and works backwards: it sets aside circulation, then meeting rooms, cabins and support spaces, and divides what remains by the area one workstation needs. The result is how many desks a floor can hold and, with hybrid working, how many people those desks can serve.
Pump head is the height of water column a pump must lift against: the static height to the outlet, plus the friction loss in the pipe and fittings, plus any pressure needed at the outlet. Multiplying the flow by the head and by 9.81 gives the hydraulic power in kW; dividing by pump efficiency and adding a motor margin gives a screening motor rating.
A raised access floor is a grid of removable panels on adjustable pedestals above the slab. On a 600 × 600 mm grid, the panel count follows from the floor area, a pedestal sits at every grid intersection, and stringers, where used, run along the grid lines. The quantities come straight from the room size.
UPS runtime is how long a battery bank can carry a load after the mains fails. A linear estimate multiplies battery voltage, Ah and the number of batteries to get stored energy, reduces it for usable depth of discharge, ageing and inverter efficiency, and divides by the load in watts. Real runtime at high discharge rates is shorter, so battery discharge tables replace it.
A ventilation calculation sets how much air a space needs. ASHRAE 62.1's ventilation rate procedure gives the outdoor air: a rate per person plus a rate per square metre of floor, divided by how effectively the air reaches the occupants. The air-change method multiplies room volume by a target number of air changes per hour. Offices are normally designed on the first.
Domestic water demand is the water a building's occupants use in a day for drinking, washing, cleaning and flushing, estimated as people × litres per person per day. NBC 2016 Part 9 tabulates per-person figures by building type, 45 litres a day for offices. Storage is the daily demand times the days of supply held, split between an overhead tank and an underground sump.
A flooring quantity calculation turns a room's area into the number of tiles, carpet tiles or planks to order: floor area plus a wastage allowance for the laying pattern, divided by the area of one piece, rounded up to whole pieces and then to whole boxes.
A grid false ceiling is built from main tees hung from the slab, cross tees clipped between them to form a grid, a wall angle around the edge, and lay-in tiles. For a 600 × 600 mm grid the quantity of each part follows directly from the ceiling area and perimeter.
A gypsum (drywall) partition is a frame of metal studs set in floor and ceiling tracks, faced with gypsum boards on one or both sides. Its quantities follow from the partition area less openings, the number of board faces, the stud spacing and the lengths in which studs and track are supplied.
A paint quantity calculation works out the area to be painted, the walls less doors and windows plus the ceiling if included, multiplies it by the number of coats, and divides by the paint's coverage for each litre. A small allowance covers touch-ups and wastage.
AC tonnage is the rate at which an air-conditioning system removes heat, measured in tons of refrigeration (TR); one TR is 12,000 BTU/h or about 3.5 kW. A screening calculation adds up the heat from people, fresh air, lighting, equipment and the building envelope to give a first estimate of the tonnage an office needs.
Carpet area is the usable floor inside your walls. Built-up area adds the walls. Super built-up (chargeable) area adds a share of the building's common areas, which is the loading. With the loading known, any one of the three can be converted to the other two.
A quotation comparison puts several contractors' prices on the same basis before they are compared: the same treatment of GST, the cost of anything one quote leaves out added back, and the cash each asks for up front or holds back shown side by side. Without that, the lowest headline number is often not the lowest cost.
A fit-out timeline estimate adds design, approvals, site works, procurement, installation and handover into one programme. Site works and long-lead procurement run in parallel, so whichever takes longer sets the handover date. That phase is the critical path.
The lumen method works out how many light fittings a room needs to reach a target average illuminance: N = (E × A) / (Φ × UF × MF). It gives a fitting count, a connected load and a lighting power density for early planning, before a lighting designer runs a full point-by-point calculation.
An office space planner turns a headcount and a list of rooms into the carpet area a team needs, then adds the building's loading to give the chargeable area to lease. It is a briefing tool for shortlisting buildings, not a layout.