Our Portfolio

Discover completed office design & build projects, modern office interior design, MEP design, and interior fit out work across corporate HQs, coworking spaces, showrooms, and commercial buildings in Delhi NCR and other Indian cities.

Theon Life Sciences modern pharmaceutical office reception with double-height ceiling and contemporary lounge seating in DeraBassi, Chandigarh

Theon Life Sciences Corporate Office

Theon Life Sciences Pvt. Ltd.
Pharmaceutical Office
DeraBassi, Chandigarh
40,000 sq ft
Revolve software company modern office reception with contemporary design in Gurgaon

Revolve Software Technology Office

Revolve Technologies Pvt. Ltd.
Software Company
Gurgaon, Haryana
MicroSave Consulting MSC corporate office reception with professional interior design in Delhi

MicroSave Consulting (MSC) Corporate Office

MicroSave Consulting Pvt. Ltd.
Consulting
Delhi
Himalaya Construction corporate office reception with modern clean design aesthetic

Himalaya Construction Corporate Office

Himalaya Construction Pvt. Ltd.
Construction
VinFast electric vehicle showroom interior with modern display area and premium lighting in Jaipur

VinFast Electric Vehicle Showroom

VinFast India
Automobile Showroom & Parking
Jaipur / Delhi NCR
20,000 sq ft
Meeting room with neutral wall panelling, acoustic panels, and a six-seat conference table at Valorium Ventures office interior

Valorium Ventures – Office Interior Project

Compact commercial office with a neutral palette, conference room for six, director cabin, and efficient workstations.

Valorium Ventures
Commercial Office Interior
Kokko Town reception desk with a green airplane-window feature wall and backlit signage in Sector 17, Chandigarh

Kokko Town – Indoor Kids' Play Zone & Family Café

A 6,500 sq. ft. indoor kids' play zone and family café in Chandigarh, built as a two-level pretend-play town.

Kokko Town
Indoor Kids' Play Zone & Family Café
Sector 17, Chandigarh
6,500 sq. ft.
MinebeaMitsumi production floor in Peenya, Bengaluru with epoxy-coated blue flooring, overhead cable trays and assembly workstations

MinebeaMitsumi Manufacturing Facility

MinebeaMitsumi
Manufacturing & Industrial Facility
Peenya, Bengaluru
30,000 sq ft
Backlit SAEL signage on a ribbed wood-panel wall above the reception desk at the SAEL Aerocity office

SAEL Aerocity Corporate Office

SAEL
Renewable Energy Company Office
Aerocity, Delhi
10,000 sq ft
Yanmar engine factory office in Ponneri with rows of workstations under a grid ceiling

Yanmar Engine Factory Office Interiors

Office interiors across 50,000 sq ft at the Yanmar engine factory in Ponneri, near Chennai, delivered with Takenaka.

Yanmar (with Takenaka)
Industrial Office Interiors
Ponneri, Tamil Nadu
50,000 sq ft
Synergy Consulting reception in Jasola, New Delhi, with marble-look wall panels, a timber slat ceiling and a timber reception desk

Synergy Consulting Office Design & Build

Design and build of Synergy Consulting's 18,000 sq ft third-floor office in Jasola, New Delhi, and a later extension of the same floor.

Synergy Consulting
Office Design & Build
Jasola, New Delhi
20,000 sq ft
EDF International office workstations with framed artwork, linear pendant lights and exposed ducting in Saket, New Delhi

EDF International Office Design & Build

Design and build of EDF International Networks' India head office at DLF South Court, Saket, New Delhi.

EDF International Networks
Office Design & Build
DLF South Court, Saket, New Delhi
Trunkhouse luggage store in Mumbai with rose-gold shelving, green armchairs and patterned flooring

Trunkhouse Design & Build

Design and build of the Trunkhouse space in Mumbai for Beauty Impex.

Beauty Impex (Trunkhouse)
Retail Showroom
Mumbai, Maharashtra
Hashtag Orange open office in Gurugram with black dome pendant lights, timber flooring and glass-partitioned cabins

Hashtag Orange Office Design & Build

Design and build of Hashtag Orange's corporate office at Emaar Palm Spring Plaza, Golf Course Road, Gurugram, completed in 45 days.

Hashtag Orange
Office Design & Build
Emaar Palm Spring Plaza, Golf Course Road, Gurugram
Corridor at Monin's Chhatarpur premises with timber-panelled rooms, cross-braced doors, planters and an exposed black steel ceiling

Monin Turnkey Interiors

Turnkey interiors across 5,000 sq ft for Monin in Chhatarpur, New Delhi.

Monin
Turnkey Interiors
Chhatarpur, New Delhi
5,000 sq ft
SP Infocity lobby lounge in Gurugram with patterned art panels, leather sofas and a blue carpet

SP Infocity Design & Build

Design and build across 10,000 sq ft at SP Infocity in Gurugram.

SP Infocity
Office Design & Build
Gurugram, Haryana
10,000 sq ft
Takenaka head office in Gurugram with timber workstations, storage units and a green accent wall

Takenaka HQ Turnkey Interiors

Turnkey interiors for Takenaka's headquarters office in Gurugram.

Takenaka
Turnkey Interiors
Gurugram, Haryana
Inshorts Media office lounge in Noida with armchairs, a terracotta feature wall and an exposed black ceiling

Inshorts Media Office Renovation

Renovation works at Inshorts Media's office in Noida.

Inshorts Media
Office Renovation
Noida, Uttar Pradesh
Imperial Malts single-storey pre-engineered office building in Sector 49, Gurugram, with a steel canopy and ramp

Imperial Malts PEB Office Building

A pre-engineered office building for Imperial Malts in Sector 49, Gurugram, delivered end to end in 60 days: the structure, then turnkey interiors including MEP and furniture.

Imperial Malts
Pre-Engineered Building
Sector 49, Gurugram, Haryana
Medtronic demo room in Gurugram with a navy feature wall, glazed viewing panel and medical equipment

Medtronic Office Design & Build

Design and build of Medtronic's 5,000 sq ft office in Gurugram.

Medtronic
Office Design & Build
Gurugram, Haryana
5,000 sq ft
Turnkey InteriorsPSV Urbana2019–2021

PSV Urbana Turnkey Interiors

Turnkey interiors across 30,000 sq ft for PSV Urbana in Gurugram, followed by a separate furniture supply package for the same client.

PSV Urbana
Turnkey Interiors
Gurugram, Haryana
30,000 sq ft
Industrial InteriorsPanasonic Life Solutions (with Takenaka)2019–2021

Panasonic Life Solutions Interior Works

Interior works across 2,00,000 sq ft at Panasonic Life Solutions' facility in Sri City, Andhra Pradesh, delivered with Takenaka.

Panasonic Life Solutions (with Takenaka)
Industrial Interiors
Sri City, Andhra Pradesh
2,00,000 sq ft
Office Design & BuildOceaneering2019–2021

Oceaneering Office Design & Build

Design and build of Oceaneering's 20,000 sq ft office in Chandigarh.

Oceaneering
Office Design & Build
Chandigarh
20,000 sq ft
Office Design & BuildEl Corte Inglés2019–2021

El Corte Inglés Office Design & Build

Design and build of El Corte Inglés' 20,000 sq ft office in Gurugram.

El Corte Inglés
Office Design & Build
Gurugram, Haryana
20,000 sq ft
Retail ShowroomBeauty Impex (Byredo)2019–2021

Byredo Showroom Design & Build

Design and build of a Byredo showroom in Mumbai for Beauty Impex.

Beauty Impex (Byredo)
Retail Showroom
Mumbai, Maharashtra
Fire-Fighting SystemsBCG (Boston Consulting Group)2019–2021

BCG Fire-Fighting Works

Fire-fighting works at BCG's office in Gurugram.

BCG (Boston Consulting Group)
Fire-Fighting Systems
Gurugram, Haryana
Office Design & BuildRenesas Electronics2019–2021

Renesas Electronics Office Design & Build

Design and build of Renesas Electronics' office in Jasola, New Delhi.

Renesas Electronics
Office Design & Build
Jasola, New Delhi
Office Design & BuildTidong Power2019–2021

Tidong Power Office Design & Build

Design and build of Tidong Power's hydropower project office in Shimla.

Tidong Power
Office Design & Build
Shimla, Himachal Pradesh
Furniture SupplyPiya Facility Management2019–2021

Piya Facility Management Furniture Supply

Office furniture supply for Piya Facility Management in Gurugram.

Piya Facility Management
Furniture Supply
Gurugram, Haryana
Office Design & BuildLexir Resources2019–2021

Lexir Resources Office Design & Build

Design and build of Lexir Resources' 10,000 sq ft office in Gurugram.

Lexir Resources
Office Design & Build
Gurugram, Haryana
10,000 sq ft
Office RenovationAlps Electric2019–2021

Alps Electric Office Renovation

Renovation works at Alps Electric's office in Gurugram.

Alps Electric
Office Renovation
Gurugram, Haryana
Office Design & BuildSRP & Company, Chartered Accountants2021

SRP & Company Office Design & Build

Design and build of the office of SRP & Company, Chartered Accountants, at Netaji Subhash Place, Pitampura, completed in 60 days.

SRP & Company, Chartered Accountants
Office Design & Build
Netaji Subhash Place, Pitampura, Delhi
Office Design & BuildDorient Solutions2019–2021

Dorient Solutions Office Design & Build

Design and build of Dorient Solutions' office in Pitampura, Delhi.

Dorient Solutions
Office Design & Build
Pitampura, Delhi
Civil & InteriorsMPKUPL2019–2021

MPKUPL Civil & Interior Works

Civil and interior works across 20,000 sq ft for MPKUPL in Jalna, Maharashtra.

MPKUPL
Civil & Interiors
Jalna, Maharashtra
20,000 sq ft
Turnkey InteriorsAirtel2019–2021

Airtel Office Turnkey Interiors

Turnkey interiors for Airtel's 5,000 sq ft office in Raipur, Chhattisgarh.

Airtel
Turnkey Interiors
Raipur, Chhattisgarh
5,000 sq ft
Turnkey InteriorsFrench Embassy2019–2021

French Embassy Turnkey Interiors

Turnkey interiors at the French Embassy in Chanakyapuri, New Delhi.

French Embassy
Turnkey Interiors
Chanakyapuri, New Delhi
Office RenovationAECOM2019–2021

AECOM Office Renovation

Renovation works at AECOM's office in Gurugram.

AECOM
Office Renovation
Gurugram, Haryana
Furniture SupplyDARCL2019–2021

DARCL Furniture Supply

Office furniture supply for DARCL in Gurugram.

DARCL
Furniture Supply
Gurugram, Haryana
Commercial Design & BuildPriya Complex2019–2021

Priya Complex Design & Build

Design and build of a commercial space at Priya Complex, Basant Lok, New Delhi.

Priya Complex
Commercial Design & Build
Basant Lok, New Delhi
Pre-Engineered BuildingArcon2019–2021

Arcon PEB Structure

Pre-engineered building structure work across 15,000 sq ft for Arcon in Noida.

Arcon
Pre-Engineered Building
Noida, Uttar Pradesh
15,000 sq ft
Furniture SupplySeismic Solution2019–2021

Seismic Solution Furniture Supply

Office furniture supply for Seismic Solution in Noida.

Seismic Solution
Furniture Supply
Noida, Uttar Pradesh
Exhibition StandHermès2019–2021

Hermès Exhibition Stand

An exhibition stand for Hermès at Terminal 3 of Delhi's IGI Airport.

Hermès
Exhibition Stand
Terminal 3, IGI Airport, Delhi
Cinema InteriorsMovieTime Cinemas2019–2021

MovieTime Cinemas Turnkey Interiors

Turnkey interiors across 5,000 sq ft for MovieTime Cinemas in Hyderabad.

MovieTime Cinemas
Cinema Interiors
Hyderabad, Telangana
5,000 sq ft
Office Design & BuildGLS Infra2019–2021

GLS Infra Office Design & Build

Three design and build office fit-outs for GLS Infra in Gurugram, 6,000 sq ft in total.

GLS Infra
Office Design & Build
Gurugram, Haryana
6,000 sq ft
RenovationLufthansa2019–2021

Lufthansa Renovation, Delhi Airport

Renovation work for Lufthansa at Terminal 3 of Delhi's IGI Airport.

Lufthansa
Renovation
Terminal 3, IGI Airport, Delhi
RenovationSingapore Airlines2019–2021

Singapore Airlines Renovation, Delhi Airport

Renovation work for Singapore Airlines at Terminal 3 of Delhi's IGI Airport.

Singapore Airlines
Renovation
Terminal 3, IGI Airport, Delhi
Commercial InteriorsAIPL Joy Street2019–2021

AIPL Joy Street Interior Works

Interior works across 12,000 sq ft at AIPL Joy Street in Gurugram.

AIPL Joy Street
Commercial Interiors
Gurugram, Haryana
12,000 sq ft
Commercial Design & BuildPP Trade Centre2019–2021

PP Trade Centre Design & Build

Design and build of a commercial space at PP Trade Centre in Pitampura, Delhi.

PP Trade Centre
Commercial Design & Build
Pitampura, Delhi
Turnkey InteriorsHindusthan2019–2021

Hindusthan Turnkey Interiors

Turnkey interiors across 5,000 sq ft for Hindusthan in Connaught Place, New Delhi.

Hindusthan
Turnkey Interiors
Connaught Place, New Delhi
5,000 sq ft
Office Design & BuildRevolve Softech2021

Revolve Office Design & Build, Noida

Design and build of Revolve Softech's office at Spring Meadows Business Park, Sector 63, Noida, completed in 60 days.

Revolve Softech
Office Design & Build
Spring Meadows Business Park, Sector 63, Noida
ResidentialPrivate client2019–2021

Private Residence, Gurugram

Residential work at a private home in Gurugram.

Private client
Residential
Gurugram, Haryana

Our designs

Before a project is built it is planned. Our own design work shows the layout options for real floor plates — seat counts, cabin mix, circulation and finishes — with the reasoning behind each decision.

See our designs

Ready to Start Your Office Design & Build Project?

Whether you are planning a new office workspace design, commercial interior design, or a complete interior fit out with MEP design services, the Hagerstone team is ready to help you create a modern, efficient workspace.

Start Your Project

Planning a project like these?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback