
Kokko Town – Indoor Kids' Play Zone & Family Café
Kokko Town
Overview
Kokko Town is a 6,500 sq. ft. indoor kids' play zone and family café in Sector 17, Chandigarh, built as a miniature town where every corner doubles as a role-play destination. The design layers a pretend-play street of shopfronts — Bank, Hospital, Supermarket, Gas Station and Garage — with a farm-themed mezzanine, a full-scale RC vehicle and construction adventure zone, and interactive play features across two levels. Hagerstone delivered the project end-to-end, from civil works and theming to MEP execution and custom fabrication of every themed structure and facade.
Project Specs
| Client | Kokko Town |
|---|---|
| Project type | Indoor Kids' Play Zone & Family Café |
| Carpet area | 6,500 sq. ft. |
| Location | Sector 17, Chandigarh |
| Duration | 2-3 months |
| Year | 2026 |
| Status | Completed |
Project Scope
- •Civil works and site modifications across base and mezzanine levels
- •Complete interior design, theming and space planning
- •MEP execution — electrical, plumbing and ventilation
- •Custom furniture design and fabrication
- •Themed zone fabrication — pretend play facades, arcade and play structures
- •Turnkey delivery from design to handover
Special Features
- ✓Two-level pretend-play town square with Bank, Hospital, Supermarket, Gas Station and Garage facades
- ✓Full-scale RC vehicle and construction-themed adventure zone with an off-road obstacle course
- ✓Farm-themed mezzanine with a train-carriage viewing balcony
- ✓Interactive sensory play wall with a foam-panel "finish" game feature
- ✓Light-up interactive dance floor at the entrance, beneath backlit Kokko Town signage
Materials Used
- •Commercial-grade plywood substructure
- •Gypsum board false ceilings and partitions
- •MDF profiles and themed fabrication elements
- •Modular electrical panels and distribution
- •Sanitary ware and plumbing fixtures
Gallery
Reception
A welcoming entrance that sets the tone before the play begins — a sculptural green feature wall with an airplane-window cutout sits beneath the backlit Kokko Town sign, framing the reception desk.

Family Café
A rooftop-style café terrace with an arched colonnade, terrazzo flooring and a spiral staircase up to a games lounge — a relaxed space for parents while children play.


Pretend Play Street - Supermarket, Gas Station & Garage
A miniature town street built for role play, with two-storey Supermarket, Gas Station and Garage facades complete with fuel pumps, a street lamp, road markings and a stocked grocery interior for realistic pretend play.



Farmland Mezzanine & Kokko Town Marquee
A farm-themed mezzanine level overlooking the ground floor, featuring a train-carriage viewing balcony above the backlit Kokko Town marquee and a colourful checkered floor.


Pretend Play Town - Bank, Hospital & Prison
A multi-storey pretend-play town square with dedicated Bank, Hospital, Cafe, Garage and Prison facades, giving children a full civic role-play experience across two levels.


Toddler Play Zone
A dedicated soft-play zone for toddlers built around an airplane-themed structure with a spiral slide and padded enclosures for safe, independent play.

RC Car & Construction Adventure Zone
A large-scale off-road and construction-themed adventure zone with a rope bridge, wooden ramps, log obstacles, an RC vehicle track and a full excavation pit with scaled construction machinery.


Sensory Play Wall
A tactile, interactive sensory wall with spinning and rotating elements, textured panels and a digital timer, built as an activity feature near the Hospital pretend-play zone.


Frequently asked
Related Projects
A manufacturing facility fit-out for MinebeaMitsumi in the Peenya industrial belt of Bengaluru, covering interior fit-out, MEP, civil, electrical, plumbing, HVAC and an overhead crane across 30,000 sq ft of production and warehouse floor.
A corporate office fit-out for SAEL, a solar energy company, in Aerocity, Delhi, covering interior fit-out, MEP, civil, electrical, plumbing, HVAC and furniture across 10,000 sq ft.
Office interiors across 50,000 sq ft at the Yanmar engine factory in Ponneri, near Chennai, delivered with Takenaka.
Design and build of Synergy Consulting's 18,000 sq ft third-floor office in Jasola, New Delhi, and a later extension of the same floor.
Design and build of EDF International Networks' India head office at DLF South Court, Saket, New Delhi.
Design and build of the Trunkhouse space in Mumbai for Beauty Impex.
Inspired by This Project?
Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.
Start Your Project