Office Interior Design Ideas

Real rooms from our projects and design studies, sorted by room type

Every photo on this page comes from a Hagerstone project page or one of our design studies. A photo marked Delivered project shows built work. A photo marked Design concept is a render from a design study, not a completed site. Select any card to see where it comes from.

Room Type

Show

Office reception design ideas

The reception is the first room a visitor sees. These show how the desk, the logo wall and the waiting seats were arranged.

The logo sits on a green wall behind a stone-finish desk, with triangular carpet tiles and hexagon-pattern glass on either side.
Delivered project
Reception

A green wall behind the reception desk

The logo sits on a green wall behind a stone-finish desk, with triangular carpet tiles and hexagon-pattern glass on either side.

Revolve Software Technology Office, Gurgaon, Haryana
Marble-look wall panels carry the logo, with a timber slat ceiling overhead and a timber reception desk in the corner.
Delivered project
Reception

Marble-look walls under a timber slat ceiling

Marble-look wall panels carry the logo, with a timber slat ceiling overhead and a timber reception desk in the corner.

Synergy Consulting Office Design & Build, Jasola, New Delhi
A double-height entrance lobby with a green wall beside the feature staircase and sofas on a blue carpet inlay.
Delivered project
Reception

A double-height lobby with a green wall

A double-height entrance lobby with a green wall beside the feature staircase and sofas on a blue carpet inlay.

SP Infocity Design & Build, Gurugram, Haryana
A stone-floored reception with a curved counter and lounge seating, the wall behind the counter left plain for signage.
Design concept
Reception

A back wall left plain for signage

A stone-floored reception with a curved counter and lounge seating, the wall behind the counter left plain for signage.

NBFC head office design study

Office cabin design ideas

Director and MD cabins, where the desk, the visitor chairs and the storage wall have to share a small room.

A director's cabin with a timber-slatted ceiling, a full wall of display storage and a dark timber desk.
Delivered project
Cabins

A slatted timber ceiling over the director's desk

A director's cabin with a timber-slatted ceiling, a full wall of display storage and a dark timber desk.

Imperial Malts PEB Office Building, Sector 49, Gurugram, Haryana
An MD cabin with a geometric wood-lattice ceiling, a curved executive desk, leather chairs and a built-in storage unit.
Delivered project
Cabins

A wood-lattice ceiling and a curved desk

An MD cabin with a geometric wood-lattice ceiling, a curved executive desk, leather chairs and a built-in storage unit.

SAEL Aerocity Corporate Office, Aerocity, Delhi
A glass-walled cabin with timber and black-metal shelving behind the desk and a circular pendant light.
Delivered project
Cabins

Open shelving in timber and black metal

A glass-walled cabin with timber and black-metal shelving behind the desk and a circular pendant light.

EDF International Office Design & Build, DLF South Court, Saket, New Delhi
A managing director's cabin of 10 ft by 8 ft 6 in with a desk, two visitor chairs and full-height timber storage.
Design concept
Cabins

A compact MD cabin with full-height storage

A managing director's cabin of 10 ft by 8 ft 6 in with a desk, two visitor chairs and full-height timber storage.

Small office design study

Meeting and conference room design ideas

Boardrooms and conference rooms, from six seats to twenty: the table, the screen wall and the ceiling over them.

A boardroom with a long oval timber table and white chairs, facing a logo wall set between timber and blue panels.
Delivered project
Meeting Rooms

An oval boardroom table facing the logo wall

A boardroom with a long oval timber table and white chairs, facing a logo wall set between timber and blue panels.

Theon Life Sciences Corporate Office, DeraBassi, Chandigarh
A conference room with hexagon ring lights over a long timber table, a patterned feature wall and a yellow diagonal band.
Delivered project
Meeting Rooms

Hexagon ring lights over a long table

A conference room with hexagon ring lights over a long timber table, a patterned feature wall and a yellow diagonal band.

Revolve Software Technology Office, Gurgaon, Haryana
A conference room with a green feature wall at the head of the table and a circular cove in the ceiling above it.
Delivered project
Meeting Rooms

A circular cove ceiling and a green feature wall

A conference room with a green feature wall at the head of the table and a circular cove in the ceiling above it.

Takenaka HQ Turnkey Interiors, Gurugram, Haryana
A long conference room with a twenty-seat table under a timber ceiling and a globe chandelier, with a screen wall at the end.
Design concept
Meeting Rooms

A twenty-seat table under a globe chandelier

A long conference room with a twenty-seat table under a timber ceiling and a globe chandelier, with a screen wall at the end.

Two-floor corporate office design study, Gurugram

Office workstation design ideas

Open work floors: how the desk rows run, what divides them and what the ceiling does above.

An open-plan office with long team desks under linear lights and an exposed black ceiling.
Delivered project
Workstations

Long team tables under linear lights

An open-plan office with long team desks under linear lights and an exposed black ceiling.

Inshorts Media Office Renovation, Noida, Uttar Pradesh
Workstations with orange and white screens run toward full-height windows with a view over the city, under black dome pendants.
Delivered project
Workstations

Desks that run to a full-height window

Workstations with orange and white screens run toward full-height windows with a view over the city, under black dome pendants.

Hashtag Orange Office Design & Build, Emaar Palm Spring Plaza, Golf Course Road, Gurugram
An open-plan work floor with planter boxes at the ends of the desk rows, words printed on the columns and a yellow accent wall.
Delivered project
Workstations

Planter boxes dividing the workstation rows

An open-plan work floor with planter boxes at the ends of the desk rows, words printed on the columns and a yellow accent wall.

Theon Life Sciences Corporate Office, DeraBassi, Chandigarh
An open office with oak desks on graphite frames, sage fabric screens, planted storage and a terrazzo-look floor.
Design concept
Workstations

Oak desks with sage screens and planted storage

An open office with oak desks on graphite frames, sage fabric screens, planted storage and a terrazzo-look floor.

Industrial company office design study, Delhi

Office pantry and cafeteria design ideas

Pantries and cafeterias, from a single bar table to a room of long shared tables.

An office cafeteria with a mural across the back wall, yellow and white chairs at white tables, and a pantry counter along one side.
Delivered project
Pantry & Cafeteria

A wall mural and yellow chairs in the cafeteria

An office cafeteria with a mural across the back wall, yellow and white chairs at white tables, and a pantry counter along one side.

Revolve Software Technology Office, Gurgaon, Haryana
A pantry with a high timber bar table, metal stools, black ladder shelving and an orange accent wall.
Delivered project
Pantry & Cafeteria

A bar-height table in the pantry

A pantry with a high timber bar table, metal stools, black ladder shelving and an orange accent wall.

EDF International Office Design & Build, DLF South Court, Saket, New Delhi
A cafeteria with long tables and black chairs set beside full-height windows.
Delivered project
Pantry & Cafeteria

Cafeteria tables along the window line

A cafeteria with long tables and black chairs set beside full-height windows.

Inshorts Media Office Renovation, Noida, Uttar Pradesh
An office cafeteria with green panelled walls, one long timber table in place of scattered fours, and patterned floor tiles.
Design concept
Pantry & Cafeteria

One long table in a panelled cafeteria

An office cafeteria with green panelled walls, one long timber table in place of scattered fours, and patterned floor tiles.

Two-floor corporate office design study, Gurugram

Office lounge and breakout design ideas

Informal seating away from the desks, for waiting, short meetings and breaks.

A lounge corner with a yellow armchair and grey armchairs around a small round table, against grey wall panels and patterned glass.
Delivered project
Lounge & Breakout

Armchairs in a quiet corner

A lounge corner with a yellow armchair and grey armchairs around a small round table, against grey wall panels and patterned glass.

MicroSave Consulting (MSC) Corporate Office, Delhi
A lobby lounge with patterned art panels on the wall above leather sofas set on a blue carpet.
Delivered project
Lounge & Breakout

Art panels above the lobby sofas

A lobby lounge with patterned art panels on the wall above leather sofas set on a blue carpet.

SP Infocity Design & Build, Gurugram, Haryana
An office lounge with armchairs in front of a terracotta feature wall, under an exposed black ceiling.
Delivered project
Lounge & Breakout

Armchairs against a terracotta wall

An office lounge with armchairs in front of a terracotta feature wall, under an exposed black ceiling.

Inshorts Media Office Renovation, Noida, Uttar Pradesh
An informal lounge off the work floor with a beige sofa, sage armchairs and a round coffee table, screened by a planter and oak slats.
Design concept
Lounge & Breakout

A lounge screened by planters and oak slats

An informal lounge off the work floor with a beige sofa, sage armchairs and a round coffee table, screened by a planter and oak slats.

Manufacturing company office design study

Inspired by What You See?

Send us your floor plan and headcount, and our designers will take it from there

Looking for tailored interior solutions?

Explore our service lines, see our design studies in full, or connect with our team to plan a workspace that matches your brand and budget.

Found a design you like?

Tell us about your space. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback