Inshorts Media office lounge in Noida with armchairs, a terracotta feature wall and an exposed black ceiling
Inshorts Media office lounge in Noida with armchairs, a terracotta feature wall and an exposed black ceiling

Inshorts Media Office Renovation

Inshorts Media

Overview

Renovation of Inshorts Media's office in Noida by Hagerstone. The floor mixes open team tables with a generous amount of social space: lounges, a library-style display wall, a curved glass meeting area, a cafeteria, a recreation room and a games room. An open black ceiling, a terracotta feature wall and warm wood-finish floors tie it together, with full-height glazing along the perimeter.

Project Specs

ClientInshorts Media
Project typeOffice Renovation
LocationNoida, Uttar Pradesh
Year2019–2021
StatusCompleted

Project Scope

  • •Office renovation

Special Features

  • ✓Curved glass enclosure for an informal meeting area
  • ✓Swing chairs and lounge seating along the window line
  • ✓Freestanding white shelving wall used as a display library
  • ✓Games room with foosball and bean bags
  • ✓Recreation room with a TV wall and pouf seating
  • ✓Timber-panelled reception at the lift lobby

Materials Used

  • •Open ceiling painted black with exposed ducts
  • •Terracotta painted feature wall
  • •Wood-finish flooring with carpet-tile zones
  • •Frameless curved glass partitions
  • •Timber veneer wall panelling at reception

Gallery

Lounges & breakout

Lounges run along the glazed edge of the floor: armchairs in front of a terracotta wall, a white shelving library, swing chairs by the windows, and separate recreation and games rooms.

Inshorts Media office lounge in Noida with armchairs, a terracotta feature wall and an exposed black ceiling
Inshorts Media office lounge in Noida with armchairs, a terracotta feature wall and an exposed black ceiling
Inshorts Media lounge with white open shelving, bean bags and a view over the city
Inshorts Media lounge with white open shelving, bean bags and a view over the city
Inshorts Media breakout area with swing chairs and lounge seating by full-height glazing
Inshorts Media breakout area with swing chairs and lounge seating by full-height glazing
Inshorts Media recreation room with yellow bean chairs, poufs and a TV wall
Inshorts Media recreation room with yellow bean chairs, poufs and a TV wall
Inshorts Media games room with a foosball table and bean bags
Inshorts Media games room with a foosball table and bean bags

Work & dining

Team tables under linear lights, a curved glass meeting area with timber chairs, a cafeteria beside the windows and a timber-panelled reception at the lifts.

Inshorts Media open-plan office with long team desks under linear lights
Inshorts Media open-plan office with long team desks under linear lights
Inshorts Media curved glass meeting area with timber chairs and round tables
Inshorts Media curved glass meeting area with timber chairs and round tables
Inshorts Media cafeteria with long tables and black chairs beside the windows
Inshorts Media cafeteria with long tables and black chairs beside the windows
Inshorts Media lift lobby and reception with timber wall panelling
Inshorts Media lift lobby and reception with timber wall panelling

Frequently asked

Project type: Office Renovation. Client: Inshorts Media. Location: Noida, Uttar Pradesh.

The scope covered: Office renovation.

Materials used: Open ceiling painted black with exposed ducts; Terracotta painted feature wall; Wood-finish flooring with carpet-tile zones; Frameless curved glass partitions; Timber veneer wall panelling at reception.

Main features: Curved glass enclosure for an informal meeting area; Swing chairs and lounge seating along the window line; Freestanding white shelving wall used as a display library; Games room with foosball and bean bags; Recreation room with a TV wall and pouf seating; Timber-panelled reception at the lift lobby.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback