Medtronic demo room in Gurugram with a navy feature wall, glazed viewing panel and medical equipment
Medtronic demo room in Gurugram with a navy feature wall, glazed viewing panel and medical equipment

Medtronic Office Design & Build

Medtronic

Overview

A 5,000 sq ft space for Medtronic in Gurugram, designed and built by Hagerstone to house training and demonstration rooms for medical equipment. The rooms are kept clean and bright — light floors, a grid ceiling and cove lighting — so the equipment is the focus, with a navy feature wall, a glazed viewing panel and backlit blue display shelving for the brand.

Project Specs

ClientMedtronic
Project typeOffice Design & Build
Carpet area5,000 sq ft
LocationGurugram, Haryana
Year2019–2021
StatusCompleted

Project Scope

  • •Design & build across 5,000 sq ft

Special Features

  • ✓Navy feature wall with a glazed viewing panel
  • ✓Backlit blue display shelving
  • ✓Cove lighting around the ceiling edge
  • ✓Floor service boxes for equipment power and data
  • ✓Open floor space sized for mobile equipment

Materials Used

  • •Grid ceiling tiles with linear AC grilles
  • •Light grey resilient flooring
  • •Navy painted feature wall
  • •Grey roller blinds

Gallery

Training & demo rooms

Open rooms with space to arrange equipment, display screens on mobile stands, floor service boxes, and a navy feature wall with a glazed panel into the next room.

Medtronic demo room in Gurugram with a navy feature wall, glazed viewing panel and medical equipment
Medtronic demo room in Gurugram with a navy feature wall, glazed viewing panel and medical equipment
Medtronic equipment bay with medical systems arranged along a grey wall and floor service boxes
Medtronic equipment bay with medical systems arranged along a grey wall and floor service boxes
Medtronic training room with a grid ceiling, display screens and equipment stations
Medtronic training room with a grid ceiling, display screens and equipment stations
Wide view of the Medtronic training room with blue backlit wall panels
Wide view of the Medtronic training room with blue backlit wall panels
Medtronic room with backlit blue display shelving and mobile screens
Medtronic room with backlit blue display shelving and mobile screens

Frequently asked

Project type: Office Design & Build. Client: Medtronic. Location: Gurugram, Haryana. Area: 5,000 sq ft.

The scope covered: Design & build across 5,000 sq ft.

Materials used: Grid ceiling tiles with linear AC grilles; Light grey resilient flooring; Navy painted feature wall; Grey roller blinds.

Main features: Navy feature wall with a glazed viewing panel; Backlit blue display shelving; Cove lighting around the ceiling edge; Floor service boxes for equipment power and data; Open floor space sized for mobile equipment.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback