Panasonic Life Solutions Interior Works
Panasonic Life Solutions (with Takenaka)
Overview
Hagerstone International carried out interior works across 2,00,000 sq ft for Panasonic Life Solutions in Sri City, Andhra Pradesh, working with Takenaka as main contractor between 2019 and 2021. Sri City is an integrated industrial and business city on the Andhra Pradesh–Tamil Nadu border, home to manufacturing plants of many Japanese and global companies. At two lakh square feet, this is the largest job on Hagerstone's 2019–2021 record, and it shows the team's capacity to deliver industrial interiors at factory scale alongside a Japanese general contractor.
Project Specs
| Client | Panasonic Life Solutions (with Takenaka) |
|---|---|
| Project type | Industrial Interiors |
| Carpet area | 2,00,000 sq ft |
| Location | Sri City, Andhra Pradesh |
| Year | 2019–2021 |
| Status | Completed |
Project Scope
- •Interior works across 2,00,000 sq ft
- •Delivered with Takenaka as main contractor
Frequently asked
Related Projects
A manufacturing facility fit-out for MinebeaMitsumi in the Peenya industrial belt of Bengaluru, covering interior fit-out, MEP, civil, electrical, plumbing, HVAC and an overhead crane across 30,000 sq ft of production and warehouse floor.
Office interiors across 50,000 sq ft at the Yanmar engine factory in Ponneri, near Chennai, delivered with Takenaka.
Design and build of Oceaneering's 20,000 sq ft office in Chandigarh.
Design and build of El Corte Inglés' 20,000 sq ft office in Gurugram.
Design and build of a Byredo showroom in Mumbai for Beauty Impex.
Fire-fighting works at BCG's office in Gurugram.
Inspired by This Project?
Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.
Start Your Project