Yanmar engine factory office in Ponneri with rows of workstations under a grid ceiling
Yanmar engine factory office in Ponneri with rows of workstations under a grid ceiling

Yanmar Engine Factory Office Interiors

Yanmar (with Takenaka)

Overview

Office interiors across 50,000 sq ft at the Yanmar engine factory in Ponneri, Tamil Nadu, north of Chennai, delivered by Hagerstone with Takenaka as main contractor. The photos, taken at handover, show large open-plan office floors with workstation clusters, a double-height lobby with a ring pendant and a curved red bench, and a red feature staircase framed by black glazing.

Project Specs

ClientYanmar (with Takenaka)
Project typeIndustrial Office Interiors
Carpet area50,000 sq ft
LocationPonneri, Tamil Nadu
Year2019–2021
StatusCompleted

Project Scope

  • •Office interiors across 50,000 sq ft
  • •Delivered with Takenaka as main contractor

Special Features

  • ✓Double-height lobby with a large ring pendant
  • ✓Curved red bench wrapped around a black feature wall with a screen
  • ✓Red feature staircase with steel handrails
  • ✓Black-framed internal glazing overlooking the lobby
  • ✓Red carpet runners marking circulation routes

Materials Used

  • •Grid ceiling with LED panels and cassette AC units
  • •Carpet tiles in the office areas
  • •Wood-finish flooring in the corridors
  • •Dark stone-look floor tiles in the lobby
  • •Black-framed glass partitions

Gallery

Office floors

Open office floors with rows of workstation clusters under a grid ceiling, and the double-height lobby with its red bench and ring pendant.

Yanmar engine factory office in Ponneri with rows of workstations under a grid ceiling
Yanmar engine factory office in Ponneri with rows of workstations under a grid ceiling
Yanmar factory open office with a red carpet runner and workstation clusters
Yanmar factory open office with a red carpet runner and workstation clusters
Yanmar factory double-height lobby with a ring pendant, black feature wall and curved red bench
Yanmar factory double-height lobby with a ring pendant, black feature wall and curved red bench

Circulation

The red feature staircase, black-framed glazing looking into the double-height space, and a wide corridor with wood-finish flooring.

Yanmar factory red feature staircase with black-framed glazing
Yanmar factory red feature staircase with black-framed glazing
Double-height space at the Yanmar factory with a black-framed glazed opening
Double-height space at the Yanmar factory with a black-framed glazed opening
Yanmar factory corridor with wood-finish flooring and glazed partitions
Yanmar factory corridor with wood-finish flooring and glazed partitions

Frequently asked

Project type: Industrial Office Interiors. Client: Yanmar (with Takenaka). Location: Ponneri, Tamil Nadu. Area: 50,000 sq ft.

The scope covered: Office interiors across 50,000 sq ft; Delivered with Takenaka as main contractor.

Materials used: Grid ceiling with LED panels and cassette AC units; Carpet tiles in the office areas; Wood-finish flooring in the corridors; Dark stone-look floor tiles in the lobby; Black-framed glass partitions.

Main features: Double-height lobby with a large ring pendant; Curved red bench wrapped around a black feature wall with a screen; Red feature staircase with steel handrails; Black-framed internal glazing overlooking the lobby; Red carpet runners marking circulation routes.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback