
Hashtag Orange Office Design & Build
Hashtag Orange
Overview
Hashtag Orange's corporate office on the 8th floor of Emaar Palm Spring Plaza, Golf Course Road, Gurugram, designed and built by Hagerstone in 2019: design, interiors, MEP services and furniture, completed within the client's 45-day timeline. It fits a surprising amount into a small floor plate: open workstations running to full-height windows, glass cabins, booth seating, a lounge and a pantry. Red exposed brick, rustic timber cladding and black dome pendants give it a warm, informal character to match the brand's orange.
Project Specs
| Client | Hashtag Orange |
|---|---|
| Project type | Office Design & Build |
| Location | Emaar Palm Spring Plaza, Golf Course Road, Gurugram |
| Duration | 45 days |
| Year | 2019 |
| Status | Completed |
Project Scope
- •Interior design
- •Turnkey interior works
- •MEP services
- •Furniture
Special Features
- ✓Booth seating set against a red exposed-brick wall
- ✓Black dome pendants throughout the office
- ✓Backlit logo on a rustic timber feature wall at the entrance
- ✓Glass cabins with black frames beside the open workstations
- ✓Pine-clad pantry with filament bulb lighting
- ✓A bean-bag breakout corner on artificial grass by the windows
Materials Used
- •Red exposed-brick wall cladding
- •Rustic timber cladding
- •Pine plank wall panelling in the pantry
- •Wood-finish flooring
- •Black-framed glass partitions
- •Orange and white workstation screens
Gallery
Workspace
Workstations with orange and white screens run toward full-height windows with a view over the city. Black-framed glass cabins and a meeting room sit along the edge of the floor.




Breakout & pantry
Booth seating against red brick, a small lounge with a TV, a pine-clad pantry and a bean-bag corner by the windows give the team places to step away from their desks.




Frequently asked
Related Projects
Design and build across 10,000 sq ft at SP Infocity in Gurugram.
Design and build of Medtronic's 5,000 sq ft office in Gurugram.
Design and build of Oceaneering's 20,000 sq ft office in Chandigarh.
Turnkey interiors for Takenaka's headquarters office in Gurugram.
Renovation works at Inshorts Media's office in Noida.
A pre-engineered office building for Imperial Malts in Sector 49, Gurugram, delivered end to end in 60 days: the structure, then turnkey interiors including MEP and furniture.
Inspired by This Project?
Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.
Start Your Project