Imperial Malts single-storey pre-engineered office building in Sector 49, Gurugram, with a steel canopy and ramp
Imperial Malts single-storey pre-engineered office building in Sector 49, Gurugram, with a steel canopy and ramp

Imperial Malts PEB Office Building

Imperial Malts

Overview

A single-storey office building for Imperial Malts in Sector 49, Gurugram, delivered by Hagerstone from structure to finished interior. The building is a pre-engineered steel structure on a raised plinth, with a cantilevered canopy over a railed verandah and access ramp. Inside, a director's cabin with a slatted timber-finish ceiling and full-wall storage, a rest room and an accessible washroom were fitted out along with the building's MEP and furniture.

Project Specs

ClientImperial Malts
Project typePre-Engineered Building
LocationSector 49, Gurugram, Haryana
Duration60 days
Year2019
StatusCompleted

Project Scope

  • •Pre-engineered building structure
  • •Turnkey interiors
  • •MEP works
  • •Furniture

Special Features

  • ✓Pre-engineered steel structure on a raised plinth
  • ✓Cantilevered steel canopy over a railed verandah
  • ✓Access ramp with handrails
  • ✓Director's cabin with a slatted timber-finish ceiling feature
  • ✓Full-wall storage unit with open black display niches
  • ✓Accessible washroom with grab bars

Materials Used

  • •Pre-engineered steel frame and roof
  • •Flat wall cladding panels
  • •Timber-finish slatted ceiling panels
  • •Wood-finish flooring
  • •Wood-finish laminate storage and doors
  • •Marble-look wall cladding

Gallery

The building

The finished building: a single-storey steel structure with a light roof that cantilevers out over the verandah, steel columns and railings, and a ramp to the entrance.

Imperial Malts single-storey pre-engineered office building in Sector 49, Gurugram, with a steel canopy and ramp
Imperial Malts single-storey pre-engineered office building in Sector 49, Gurugram, with a steel canopy and ramp
Side view of the Imperial Malts pre-engineered office building with its cantilevered steel roof
Side view of the Imperial Malts pre-engineered office building with its cantilevered steel roof
Imperial Malts pre-engineered office building lit at night under the trees
Imperial Malts pre-engineered office building lit at night under the trees

Interiors

The director's cabin, with a slatted timber-finish ceiling, linear lighting and a full wall of storage, alongside a rest room and an accessible washroom.

Imperial Malts director's cabin with a timber-slatted ceiling, display storage wall and a dark timber desk
Imperial Malts director's cabin with a timber-slatted ceiling, display storage wall and a dark timber desk
Imperial Malts director's cabin seen from the entrance, with the full-wall storage unit and meeting chairs
Imperial Malts director's cabin seen from the entrance, with the full-wall storage unit and meeting chairs
Imperial Malts director's cabin desk under the slatted timber-finish ceiling feature
Imperial Malts director's cabin desk under the slatted timber-finish ceiling feature
Imperial Malts rest room with a bed, sofa and timber flooring
Imperial Malts rest room with a bed, sofa and timber flooring
Imperial Malts washroom with a wall-hung WC, grab bars and a timber vanity
Imperial Malts washroom with a wall-hung WC, grab bars and a timber vanity

Frequently asked

Project type: Pre-Engineered Building. Client: Imperial Malts. Location: Sector 49, Gurugram, Haryana.

The scope covered: Pre-engineered building structure; Turnkey interiors; MEP works; Furniture.

Materials used: Pre-engineered steel frame and roof; Flat wall cladding panels; Timber-finish slatted ceiling panels; Wood-finish flooring; Wood-finish laminate storage and doors; Marble-look wall cladding.

Main features: Pre-engineered steel structure on a raised plinth; Cantilevered steel canopy over a railed verandah; Access ramp with handrails; Director's cabin with a slatted timber-finish ceiling feature; Full-wall storage unit with open black display niches; Accessible washroom with grab bars.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback