
Trunkhouse Design & Build
Beauty Impex (Trunkhouse)
Overview
A Trunkhouse luggage store in Mumbai, designed and built by Hagerstone for Beauty Impex. The store is laid out as a bright, boutique-style space: rose-gold metal display frames and backlit niches line the walls, luggage sits on white plinths down the middle, and a marble-topped cash counter faces the entrance under a chandelier.
Project Specs
| Client | Beauty Impex (Trunkhouse) |
|---|---|
| Project type | Retail Showroom |
| Location | Mumbai, Maharashtra |
| Year | 2019–2021 |
| Status | Completed |
Project Scope
- •Design & build
Special Features
- ✓Rose-gold metal display frames on every wall
- ✓Backlit display niches and a backlit logo wall
- ✓Marble-topped cash counter with a fluted timber base
- ✓Diamond-pattern floor inlay
- ✓Glazed shopfront with illuminated letter signage
Materials Used
- •Rose-gold finish metal shelving frames
- •Marble-finish counter top
- •Fluted timber panelling
- •Patterned marble-look floor
- •Glass shopfront
Gallery
Store
The shopfront and the shop floor: rose-gold display frames, luggage on white plinths, armchairs for customers and a marble-topped cash counter.




Frequently asked
Related Projects
Design and build of a Byredo showroom in Mumbai for Beauty Impex.
A premium automotive showroom designed for VinFast's electric vehicle lineup. The project showcases modern showroom design principles with an impressive vehicle display floor, strategic lighting, customer consultation areas, administrative offices, lounge & cafeteria, workstation areas and multi-level parking facilities — all designed to deliver a superior EV buying experience.
Design and build of Hashtag Orange's corporate office at Emaar Palm Spring Plaza, Golf Course Road, Gurugram, completed in 45 days.
Design and build across 10,000 sq ft at SP Infocity in Gurugram.
Turnkey interiors for Takenaka's headquarters office in Gurugram.
Renovation works at Inshorts Media's office in Noida.
Inspired by This Project?
Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.
Start Your Project