EDF International office workstations with framed artwork, linear pendant lights and exposed ducting in Saket, New Delhi
EDF International office workstations with framed artwork, linear pendant lights and exposed ducting in Saket, New Delhi

EDF International Office Design & Build

EDF International Networks

Overview

EDF International Networks' India head office at DLF South Court, Saket, New Delhi, designed and built by Hagerstone in 2019 as an industrial-style workspace. In its letter of appreciation, EDF confirmed the office was delivered to its requirements and within the agreed timeline. The ceiling is left open with its ducts and services on show, and the space is warmed with pine slat panelling, orange accents and large photographic prints on charcoal walls. Long rows of workstations run between glass-partitioned cabins, a conference room and a pantry with a high bar table.

Project Specs

ClientEDF International Networks
Project typeOffice Design & Build
LocationDLF South Court, Saket, New Delhi
Year2019
StatusCompleted

Project Scope

  • •Design & build of the India head office

Special Features

  • ✓Exposed ceiling with spiral ductwork left on show
  • ✓Y-shaped linear LED pendants over the workstation rows
  • ✓Black cage pendants with filament bulbs at the entrance and pantry
  • ✓Black-framed glass cabins with frosted graphic film
  • ✓Pantry with a high timber bar table and an orange tiled splashback

Materials Used

  • •Pine slat wall panelling
  • •OSB (oriented strand board) desk panels
  • •Black-framed glass partitions with frosted film
  • •Orange ceramic tiles in the pantry
  • •Black metal shelving and ladder racks
  • •Charcoal painted walls

Gallery

Workspace

Two long rows of workstations with orange, grey and white desk screens, under linear pendants and an open ceiling. Cabins sit behind black-framed glass along one side.

EDF International office workstations with framed artwork, linear pendant lights and exposed ducting in Saket, New Delhi
EDF International office workstations with framed artwork, linear pendant lights and exposed ducting in Saket, New Delhi
EDF International open-plan office with orange-accented workstation screens under an exposed services ceiling
EDF International open-plan office with orange-accented workstation screens under an exposed services ceiling
EDF International work area with timber slatted wall panel, printer station and indoor plants
EDF International work area with timber slatted wall panel, printer station and indoor plants
EDF International glass-walled cabin with timber and black-metal shelving and a circular pendant light
EDF International glass-walled cabin with timber and black-metal shelving and a circular pendant light

Meeting & pantry

A conference room with a long timber table and wall screen, and a pantry with a bar-height table, metal stools, black ladder shelving and an orange tiled counter wall.

EDF International conference room with a long timber table, black mesh chairs and a wall-mounted screen
EDF International conference room with a long timber table, black mesh chairs and a wall-mounted screen
EDF International pantry with a high timber bar table, metal stools and an orange accent wall
EDF International pantry with a high timber bar table, metal stools and an orange accent wall
EDF International pantry with black-metal ladder shelving and cage pendant lights
EDF International pantry with black-metal ladder shelving and cage pendant lights
Black cage pendant light with exposed filament bulbs over the EDF International office entrance
Black cage pendant light with exposed filament bulbs over the EDF International office entrance

Frequently asked

Project type: Office Design & Build. Client: EDF International Networks. Location: DLF South Court, Saket, New Delhi.

The scope covered: Design & build of the India head office.

Materials used: Pine slat wall panelling; OSB (oriented strand board) desk panels; Black-framed glass partitions with frosted film; Orange ceramic tiles in the pantry; Black metal shelving and ladder racks; Charcoal painted walls.

Main features: Exposed ceiling with spiral ductwork left on show; Y-shaped linear LED pendants over the workstation rows; Black cage pendants with filament bulbs at the entrance and pantry; Black-framed glass cabins with frosted graphic film; Pantry with a high timber bar table and an orange tiled splashback.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback