SP Infocity Design & Build

SP Infocity

Overview

Design and build across 10,000 sq ft of common areas at SP Infocity, a commercial building in Gurugram. The double-height lobby was given patterned art panels, a vertical garden, a black stone signage wall and lounge seating on a blue carpet inlay. Waiting and meeting areas carry large murals and a glass meeting pod, and the central courtyard was turned into an outdoor café with timber pergolas and patterned paving.

Project Specs

ClientSP Infocity
Project typeOffice Design & Build
Carpet area10,000 sq ft
LocationGurugram, Haryana
Year2019–2021
StatusCompleted

Project Scope

  • •Design & build across 10,000 sq ft

Special Features

  • ✓Double-height lobby with a wall of patterned art panels
  • ✓Vertical garden alongside the lobby staircase
  • ✓Hexagonal glass meeting pod with a frosted chevron pattern
  • ✓Large-format murals in the waiting areas
  • ✓Courtyard café with timber pergolas and hanging planters

Materials Used

  • •Terrazzo flooring
  • •Blue carpet-tile inlays
  • •Black stone signage wall
  • •Printed art panels
  • •Frameless glass with frosted graphic film
  • •Timber pergolas and patterned cement-look paving tiles

Gallery

Lobby

The double-height entrance lobby: art panels, a green wall by the staircase, sofas on a blue carpet inlay, and waiting areas with skyline murals.

SP Infocity lobby lounge in Gurugram with patterned art panels, leather sofas and a blue carpet
SP Infocity lobby lounge in Gurugram with patterned art panels, leather sofas and a blue carpet
SP Infocity double-height lobby with a green wall, sofas and a feature staircase
SP Infocity double-height lobby with a green wall, sofas and a feature staircase
SP Infocity entrance steps with the building signage wall and vertical garden
SP Infocity entrance steps with the building signage wall and vertical garden
SP Infocity waiting area with a city skyline mural and patterned armchairs
SP Infocity waiting area with a city skyline mural and patterned armchairs
SP Infocity corridor lounge with a bridge mural and upholstered seating
SP Infocity corridor lounge with a bridge mural and upholstered seating

Meeting areas

A meeting table against a patterned mural wall, and a hexagonal glass pod screened with a frosted chevron film.

SP Infocity meeting area with a patterned mural wall and a white table
SP Infocity meeting area with a patterned mural wall and a white table
SP Infocity hexagonal glass meeting pod with a frosted chevron pattern
SP Infocity hexagonal glass meeting pod with a frosted chevron pattern

Courtyard

The central courtyard as an outdoor café: timber pergolas with hanging planters, patterned paving, and a mix of wicker and colourful outdoor chairs.

SP Infocity courtyard with timber pergolas, patterned paving and outdoor seating
SP Infocity courtyard with timber pergolas, patterned paving and outdoor seating
SP Infocity courtyard seating under a timber pergola
SP Infocity courtyard seating under a timber pergola
SP Infocity courtyard café tables beneath a pergola with hanging plants
SP Infocity courtyard café tables beneath a pergola with hanging plants

Frequently asked

Project type: Office Design & Build. Client: SP Infocity. Location: Gurugram, Haryana. Area: 10,000 sq ft.

The scope covered: Design & build across 10,000 sq ft.

Materials used: Terrazzo flooring; Blue carpet-tile inlays; Black stone signage wall; Printed art panels; Frameless glass with frosted graphic film; Timber pergolas and patterned cement-look paving tiles.

Main features: Double-height lobby with a wall of patterned art panels; Vertical garden alongside the lobby staircase; Hexagonal glass meeting pod with a frosted chevron pattern; Large-format murals in the waiting areas; Courtyard café with timber pergolas and hanging planters.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback