MinebeaMitsumi Manufacturing Facility

MinebeaMitsumi

Overview

A manufacturing facility fit-out for MinebeaMitsumi in the Peenya industrial belt of Bengaluru, covering interior fit-out, MEP, civil, electrical, plumbing, HVAC and an overhead crane across 30,000 sq ft of production and warehouse floor.

Project Specs

ClientMinebeaMitsumi
Project typeManufacturing & Industrial Facility
Carpet area30,000 sq ft
LocationPeenya, Bengaluru
StatusCompleted

Project Scope

  • •Interior fit-out
  • •MEP coordination and execution
  • •Civil works
  • •Electrical installation
  • •Plumbing
  • •HVAC
  • •Overhead crane installation

Gallery

Production Floor

Epoxy-coated production floor with marked process stations, overhead cable trays and signage for the assembly line.

MinebeaMitsumi production floor with epoxy flooring, process station signage and overhead cable trays
MinebeaMitsumi production floor with epoxy flooring, process station signage and overhead cable trays
Assembly workstation on the MinebeaMitsumi production floor with process control panels
Assembly workstation on the MinebeaMitsumi production floor with process control panels

Mezzanine & Civil / MEP Services

Mezzanine-level office area overlooking the shop floor, with exposed cable trays, ducting and a glazed partition separating the plant from the warehouse.

Mezzanine-level overview of the MinebeaMitsumi shop floor with injection moulding machines and workstations
Mezzanine-level overview of the MinebeaMitsumi shop floor with injection moulding machines and workstations
Glazed partition between the production floor and warehouse with exposed cable trays and ducting
Glazed partition between the production floor and warehouse with exposed cable trays and ducting

Warehouse & Material Storage

Pallet racking and material storage area adjoining the production floor, with a loading bay shutter for inbound and outbound material movement.

Pallet racking and boxed material storage in the MinebeaMitsumi warehouse area
Pallet racking and boxed material storage in the MinebeaMitsumi warehouse area
Warehouse loading bay with shutter door and pallet racking at the MinebeaMitsumi facility
Warehouse loading bay with shutter door and pallet racking at the MinebeaMitsumi facility

Overhead Crane & Material Handling

Overhead crane installation spanning the warehouse bay for material handling, serving the racking and loading areas below.

Overhead crane spanning the MinebeaMitsumi warehouse bay above pallet racking
Overhead crane spanning the MinebeaMitsumi warehouse bay above pallet racking
Overhead crane rail above wrapped pallets in the MinebeaMitsumi warehouse
Overhead crane rail above wrapped pallets in the MinebeaMitsumi warehouse

Frequently asked

Project type: Manufacturing & Industrial Facility. Client: MinebeaMitsumi. Location: Peenya, Bengaluru. Area: 30,000 sq ft.

The scope covered: Interior fit-out; MEP coordination and execution; Civil works; Electrical installation; Plumbing; HVAC; Overhead crane installation.

Related Projects

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback