Theon Life Sciences modern pharmaceutical office reception with double-height ceiling and contemporary lounge seating in DeraBassi, Chandigarh

Theon Life Sciences Corporate Office

Theon Life Sciences Pvt. Ltd.

Overview

A state-of-the-art pharmaceutical corporate office designed to reflect Theon Life Sciences' commitment to innovation and excellence. The project features a stunning double-height reception, premium boardroom facilities, collaborative meeting spaces, and ergonomic workstations—all designed to enhance productivity while maintaining a professional, hygienic environment suitable for a life sciences company.

Project Specs

ClientTheon Life Sciences Pvt. Ltd.
Project typePharmaceutical Office
LocationDeraBassi, Chandigarh
Year2025

Project Scope

  • •Complete interior design and space planning
  • •Reception and lounge area design
  • •Executive boardroom with AV integration
  • •Open-plan workstation layout
  • •Meeting room cluster design
  • •MEP coordination and execution

Special Features

  • ✓Double-height reception with custom lighting
  • ✓Acoustic-optimized boardroom
  • ✓Biophilic design elements
  • ✓Energy-efficient LED lighting throughout

Materials Used

  • •Premium laminate finishes
  • •Acoustic ceiling panels
  • •Anti-microbial flooring
  • •Tempered glass partitions

Gallery

Reception & Lounge

A welcoming double-height reception with modern lounge seating, creating a sophisticated first impression for visitors and employees alike. Features custom lighting design and premium material finishes.

Theon Life Sciences reception area with modern lounge seating and double-height ceiling
Theon Life Sciences reception area with modern lounge seating and double-height ceiling
Contemporary lounge seating area at Theon Life Sciences office
Contemporary lounge seating area at Theon Life Sciences office
Ground floor view of Theon pharmaceutical office reception
Ground floor view of Theon pharmaceutical office reception

Boardroom

Premium boardroom designed for high-level meetings and client presentations, featuring integrated AV systems, acoustic treatments, and executive-grade furnishings.

Executive boardroom at Theon Life Sciences with AV integration
Executive boardroom at Theon Life Sciences with AV integration
Premium conference room interior with modern lighting
Premium conference room interior with modern lighting
Boardroom seating arrangement at Theon corporate office
Boardroom seating arrangement at Theon corporate office

Meeting Room

Focused meeting spaces designed for team collaboration and client discussions, featuring ergonomic seating and optimal acoustics.

Modern meeting room at Theon Life Sciences office
Modern meeting room at Theon Life Sciences office
Collaborative meeting space with natural lighting
Collaborative meeting space with natural lighting
Team meeting room interior design at Theon
Team meeting room interior design at Theon

Workstations

Open-plan workstation area designed for productivity and collaboration, featuring ergonomic furniture and optimal spacing for a pharmaceutical work environment.

Open-plan workstation area at Theon Life Sciences office
Open-plan workstation area at Theon Life Sciences office
Ergonomic workstations with modern design at Theon corporate
Ergonomic workstations with modern design at Theon corporate

Frequently asked

Project type: Pharmaceutical Office. Client: Theon Life Sciences Pvt. Ltd.. Location: DeraBassi, Chandigarh.

The scope covered: Complete interior design and space planning; Reception and lounge area design; Executive boardroom with AV integration; Open-plan workstation layout; Meeting room cluster design; MEP coordination and execution.

Materials used: Premium laminate finishes; Acoustic ceiling panels; Anti-microbial flooring; Tempered glass partitions.

Main features: Double-height reception with custom lighting; Acoustic-optimized boardroom; Biophilic design elements; Energy-efficient LED lighting throughout.

Related Projects

Revolve Software Technology Office

A cutting-edge technology office designed to foster innovation, collaboration, and employee well-being. The Revolve project showcases modern tech-office aesthetics with an impressive reception, executive MD cabin, open workstations, collaborative conference rooms, and a vibrant cafeteria—all reflecting the dynamic spirit of a growing software company.

MicroSave Consulting (MSC) Corporate Office

A sophisticated consulting office designed to reflect MSC's global expertise and professional excellence. The project features an elegant reception, executive cabins for senior consultants, collaborative lounge spaces, well-equipped meeting rooms, and efficient workstation areas—all designed to support the demanding workflow of a leading consulting firm.

Himalaya Construction Corporate Office

A functional and professional corporate office designed for a leading construction company. The project reflects the client's expertise in building with a clean, modern aesthetic featuring an efficient reception, private cabins, a dedicated MD cabin, formal meeting rooms, and productive workstation areas.

VinFast Electric Vehicle Showroom

A premium automotive showroom designed for VinFast's electric vehicle lineup. The project showcases modern showroom design principles with an impressive vehicle display floor, strategic lighting, customer consultation areas, administrative offices, lounge & cafeteria, workstation areas and multi-level parking facilities — all designed to deliver a superior EV buying experience.

Valorium Ventures – Office Interior Project

A compact 700 sq. ft. office interior designed for Valorium Ventures, blending functionality, elegance, and comfort with a calming neutral palette.

Kokko Town – Indoor Kids' Play Zone & Family Café

Kokko Town is a 6,500 sq. ft. indoor kids' play zone and family café in Sector 17, Chandigarh, built as a miniature town where every corner doubles as a role-play destination. The design layers a pretend-play street of shopfronts — Bank, Hospital, Supermarket, Gas Station and Garage — with a farm-themed mezzanine, a full-scale RC vehicle and construction adventure zone, and interactive play features across two levels. Hagerstone delivered the project end-to-end, from civil works and theming to MEP execution and custom fabrication of every themed structure and facade.

Inspired by This Project?

Let's discuss how we can create a similar transformation for your space. Our team is ready to bring your vision to life.

Start Your Project

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback