UPS Battery Runtime Calculator: Backup Time from Load and Batteries

UPS runtime is how long a battery bank can carry a load after the mains fails. A linear estimate multiplies battery voltage, Ah and the number of batteries to get stored energy, reduces it for usable depth of discharge, ageing and inverter efficiency, and divides by the load in watts. Real runtime at high discharge rates is shorter, so battery discharge tables replace it.

By Dhruv Agarwal · · 5 min read

UPS battery runtime calculator

W

Real power in watts. If you only know VA, multiply by the load's power factor.

min

Used for the strings-needed result.

V

Nominal voltage of one battery, usually 12 V.

Ah

From the battery label or datasheet.

Set by the UPS's DC bus voltage; the UPS datasheet gives it.

Assumptions (edit to match your project)
%

Battery-to-output efficiency at your load, from the UPS datasheet.

%

Share of the battery's capacity used before the UPS cuts off.

%

Capacity left late in the battery's life or in a warm room. 80% is a common end-of-life planning figure.

Estimated backup time

111 min

1.84 h, linear estimate

Usable battery energy

6,144 Wh

Of 9,600 Wh nameplate in 8 batteries

DC bus voltage

96 V

8 × 12 V in series

Strings for 30 min

1

8 batteries of 100 Ah (0.27 before rounding up)

Battery current: about 34.7 A in each string, or 0.35 × the Ah rating (0.35C).

From battery label to backup time
Nameplate energy (12 V × 100 Ah × 8 × 1)9,600 Wh
× usable depth of discharge 80%7,680 Wh
× ageing and temperature derating 80%6,144 Wh
× inverter efficiency 90%5,530 Wh
Runtime at 3,000 W111 min

How this was calculated

  • Stored = 12 V × 100 Ah × 8 × 1 = 9,600 Wh
  • Usable = 9,600 × 80% × 80% = 6,144 Wh
  • Runtime = 6,144 × 90% / 3,000 W = 1.84 h = 111 min
  • Strings for 30 min = ceil(3,000 × 0.5 h / (12 × 100 × 8 × 80% × 80% × 90%)) = ceil(0.27) = 1
  • DC bus = 12 V × 8 = 96 V; current = 3,000 / 90% / 96 V / 1 = 34.7 A per string

Send this result on WhatsApp

Your figures go with the message, so our team can reply on them directly.

Send on WhatsApp

Get a detailed quote

Indicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.

What it calculates

The calculator estimates how long a UPS battery bank will carry a given load after the mains fails, in minutes and hours. It also works the problem backwards: for the backup time you need, it gives the number of parallel battery strings required.

Along the way it shows the DC bus voltage of the bank, the nameplate and usable battery energy, and the current each string has to supply. That last figure matters because it tells you how far the simple linear estimate is likely to overstate the real runtime.

It is meant for checking a quoted UPS, comparing battery options and setting expectations before a UPS supplier or electrical engineer sizes the bank properly.

Inputs

Load on the UPS is the real power in watts that the UPS supplies during an outage. Measure it at the UPS if you can, or add up the nameplate ratings of the connected equipment. If you only have VA, multiply by the load's power factor.

Backup time you need drives the reverse calculation of strings.

Battery block voltage is the nominal voltage of one battery, usually 12 V for the sealed lead-acid batteries common in UPS banks.

Battery capacity is the Ah rating from the battery label or datasheet.

Batteries in series per string is set by the UPS's DC bus voltage, which its datasheet gives. Eight 12 V batteries make a 96 V bus, for example.

Parallel strings is the number of identical strings connected side by side.

The assumptions panel holds the inverter efficiency, the usable depth of discharge and the ageing and temperature derating.

Method

  1. Stored energy (Wh) = block voltage × Ah × batteries in series × strings.
  2. Usable energy (Wh) = stored energy × usable depth of discharge × derating.
  3. Runtime (h) = usable energy × inverter efficiency ÷ load in watts. Multiply by 60 for minutes.
  4. Strings needed = load × target hours ÷ (block voltage × Ah × batteries in series × depth of discharge × derating × efficiency), rounded up to a whole string.
  5. DC bus voltage = block voltage × batteries in series.
  6. Battery current per string = load ÷ efficiency ÷ DC bus voltage ÷ strings. Dividing it by the Ah rating gives the discharge rate as a multiple of capacity, written as C.

Assumptions

AssumptionDefaultBasis
Inverter efficiency90%Battery-to-output efficiency of a typical online UPS on battery; check the datasheet at your load
Usable depth of discharge80%The share of capacity used before the UPS's low-battery cut-off
Ageing and temperature derating80%Capacity late in the battery's service life; a common end-of-life planning figure

The derating is the assumption people most often leave out. A new battery bank may deliver close to its rating, but the bank has to give the backup you need near the end of its service life too, and lead-acid capacity falls faster in warm rooms. Sizing on a new battery means the backup time quietly shrinks year after year.

Limitations

  • It is linear, so it ignores Peukert's effect. A battery delivers less energy when it is discharged quickly than when it is discharged slowly, and the Ah figure on the label is usually quoted at a slow rate (often 10 or 20 hours). At the discharge rates typical of a UPS, real runtime is shorter than this calculation. The calculator flags this when the current is above 0.1C. The battery maker's constant-power discharge table, read at the watts per battery and the end voltage of your UPS, replaces this estimate.
  • It assumes a steady load. Real loads vary; size on the load you expect at the moment the mains fails, not the average over a day.
  • It treats all strings as identical and healthy. One weak battery in a string limits the whole string.
  • It does not check the charger. A larger bank takes longer to recharge, and the UPS charger rating limits how quickly backup time is restored after an outage.
  • It does not cover lithium-ion. Lithium-ion batteries have different usable depth of discharge, efficiency and ageing behaviour; use the supplier's figures.

Worked example

A 3,000 W load on a UPS with a 96 V battery bank: one string of eight 12 V, 100 Ah batteries, with the default 90% efficiency, 80% usable depth of discharge and 80% derating.

StepCalculationResult
Nameplate energy12 V × 100 Ah × 8 × 19,600 Wh
Usable depth of discharge9,600 × 80%7,680 Wh
Ageing and temperature7,680 × 80%6,144 Wh
Inverter efficiency6,144 × 90%5,530 Wh
Runtime5,530 ÷ 3,000 W1.84 h, 111 minutes

For a target of 30 minutes, the strings needed are 3,000 × 0.5 h ÷ (12 × 100 × 8 × 80% × 80% × 90%), which is 0.27, rounded up to 1 string. The DC bus is 12 V × 8 = 96 V.

The battery current is 3,000 ÷ 90% ÷ 96 V, about 34.7 A per string, or 0.35C on a 100 Ah battery. That is several times faster than the rate a 100 Ah rating is normally quoted at, so the calculator shows its warning: expect the real runtime from the battery maker's discharge table to be noticeably less than 111 minutes.

Raise the target to 120 minutes and the calculation gives 1.09 strings, so 2 strings of eight batteries. On the linear method, two strings would run the load for about 221 minutes; halving the current per string also brings the discharge rate down, so the gap between the linear estimate and the discharge table narrows.

How engineers use it

A UPS designer starts from the critical load and the backup time the business needs, usually decided alongside the generator: minutes to bridge a DG start, or longer where there is no generator or the critical load must ride through a generator failure. The battery is then sized from the manufacturer's constant-power discharge data at the UPS's end-of-discharge voltage, with ageing and temperature allowances, rather than from Ah.

The engineer also checks what the battery room needs: floor loading, ventilation for any gas released during charging, temperature control, access for maintenance, and DC cabling and protection. Safety requirements for stationary battery installations are set out in IEC 62485-2. UPS performance itself is specified and tested to IEC 62040-3.

When a professional design must replace it

Use the calculator to check whether a quoted bank is in the right range and to compare battery options. Replace it with sizing by the UPS supplier or a qualified electrical engineer, using the battery maker's discharge tables, before batteries are ordered, whenever the backup time is critical to the business, and whenever the bank needs its own room or significant floor space. The engineer confirms the battery selection, the charger, ventilation and protection for the actual installation.

Standards referenced

  • IEC 62040-3 — UPS: method of specifying the performance and test requirements (IEC)
  • IEC 60896-21 — Stationary lead-acid batteries, valve-regulated types: methods of test (IEC)
  • IEC 62485-2 — Safety requirements for stationary battery installations (IEC)

Frequently asked

Multiply the battery block voltage by its Ah rating and by the number of batteries to get stored watt-hours. Reduce that for the usable depth of discharge and for ageing, multiply by the inverter efficiency, and divide by the load in watts. The answer is in hours. It is a linear estimate; at high discharge rates the real figure is lower.

Usually for three reasons. Batteries deliver less than their Ah rating when discharged quickly, because the rating is quoted at a slow rate. Capacity falls as batteries age and in warm rooms. And the load is often higher than assumed. The battery maker's constant-power discharge table, read at your load per battery, gives the realistic figure.

In watts, because watts are what the batteries supply. A UPS is often sold by its VA rating, but the load it carries is limited by its watt rating as well. If you only know the load in VA, multiply it by the load's power factor to get watts.

The number of batteries in series is fixed by the UPS's DC bus voltage, so it is not free to change. Backup time is extended by adding parallel strings, each with the same number of batteries in series, or by choosing batteries with a larger Ah rating. The UPS's charger must also be able to recharge the larger bank in a reasonable time.

That is a design decision about the load. A UPS that only bridges the gap until the generator takes over needs minutes of backup. One expected to run a server room without a generator needs far more batteries, space, ventilation and cooling. Most commercial buildings use a UPS for the critical load and a DG set for the rest.

Related

More in Calculators

All Calculators →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback