Duct Size Calculator: Round and Rectangular Ducts by the Velocity Method
Duct sizing by the velocity method divides the airflow by a chosen air velocity to get the duct's cross-sectional area, then turns that area into a round diameter or a rectangular width and height. A lower velocity gives a larger, quieter duct; a higher one gives a smaller duct with more noise and more pressure loss.
By Dhruv Agarwal · · 5 min read
Duct size calculator
Supply, return or fresh air carried by this length of duct.
Lower velocities are quieter but need bigger ducts. Check the figure against the designer's noise criteria.
2 means the duct is twice as wide as it is deep. Raise it when ceiling depth is tight.
Assumptions (edit to match your project)
Size step used for fabricated duct. Set it to match the sizes your fabricator works to.
A screening threshold for duct in or above occupied rooms. The designer's noise criteria govern.
Round duct diameter
500 mm
19.7 in; 490 mm before rounding; 4.81 m/s in the rounded duct
Rectangular duct (width × height)
650 × 350 mm
25.6 × 13.8 in; 614 × 307 mm before rounding
Velocity in the rectangular duct
4.15 m/s
817 fpm, after rounding the size up
Equivalent round diameter of the rectangle
515 mm
20.3 in, Huebscher formula
How this was calculated
- Q = 2,000 cfm = 0.944 m³/s (944 L/s, 3,398 m³/h, 2,000 cfm)
- A = Q / v = 0.944 / 5 = 0.1888 m²
- Round: D = √(4A / π) = 490 mm → 500 mm; v = Q / (π D² / 4) = 4.81 m/s
- Rectangular: H = √(A / AR) = √(0.1888 / 2) = 307 mm → 350 mm
- W = AR × H = 2 × 307 = 614 mm → 650 mm
- v = Q / (W × H) = 0.944 / (0.65 × 0.35) = 4.15 m/s
- De = 1.30 × (W × H)^0.625 / (W + H)^0.25 = 1.30 × (650 × 350)^0.625 / (1,000)^0.25 = 515 mm
- 1 cfm = 0.4719 L/s; 1 m/s = 196.85 fpm; 1 in = 25.4 mm
Send this result on WhatsApp
Your figures go with the message, so our team can reply on them directly.
Send on WhatsAppIndicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.
What it calculates
Given the airflow a duct has to carry and the air velocity you want in it, the calculator gives:
- the round duct diameter, rounded up to the next size step, with the velocity in the rounded duct;
- the rectangular duct width and height at the aspect ratio you choose, both rounded up, with the velocity re-checked in the rounded duct;
- the equivalent round diameter of that rectangle, for comparing it with round duct;
- every size in millimetres and inches.
It is meant for the early questions: will a duct this size fit in the ceiling void, how deep does the bulkhead need to be, and does a duct shown on a drawing look about right for the air it carries.
Inputs
Airflow is the air the length of duct carries, entered in cfm, m³/h or L/s. For a main duct it is the whole supply of the air handler; for a branch, only the share that branch serves.
Design air velocity is the speed of the air in the duct, in metres per second. It is the main choice in the method: a lower velocity is quieter and loses less pressure but needs a bigger duct, and a higher one saves space at the cost of noise and fan energy.
Rectangular aspect ratio is the width divided by the height. A ratio of 2 gives a duct twice as wide as it is deep. Raise it when the ceiling void is shallow.
The assumptions panel holds the size step that results are rounded up to and the velocity above which the calculator flags a noise risk.
Method
- Convert the airflow to m³/s (1 cfm = 0.000471947 m³/s).
- Area: A = Q / v.
- Round duct: D = √(4A / π), rounded up to the next size step.
- Rectangular duct: H = √(A / AR) and W = AR × H, each rounded up to the next size step.
- Velocity re-check: v = Q / (W × H) in the rounded rectangle, and Q / (πD² / 4) in the rounded round duct. Because the sizes only round up, the actual velocity is never higher than the design velocity.
- Equivalent round diameter of the rounded rectangle by Huebscher's formula: De = 1.30 × (W × H)^0.625 / (W + H)^0.25, with W and H in millimetres.
This is the velocity method, the simplest of the duct design methods described in the ASHRAE Handbook — Fundamentals. Designers more often size low-pressure supply duct by equal friction, or by static regain on long runs, and use velocity as a check; the velocity method is still the quickest way to a first size.
Assumptions
| Assumption | Default | Basis |
|---|---|---|
| Design velocity | 5 m/s | A moderate figure for a main duct in an office ceiling void |
| Aspect ratio | 2 : 1 | Easy to fabricate and fits most ceiling voids |
| Size step | 50 mm | Sizes rounded up to the next 50 mm |
| Velocity flagged for noise | 8 m/s | A screening threshold only; the designer's noise criteria govern |
The velocity is the assumption to question first. Low-velocity supply systems in offices commonly run their main ducts at moderate speeds and slow down towards the diffusers, with the slowest air nearest the quietest rooms. A duct above a boardroom or a recording studio needs a lower figure than one in a basement plant room. The designer sets each velocity from the noise criteria for the space and the pressure the fan can deliver.
Limitations
- It does not calculate pressure loss. Friction along the duct and losses at bends, branches, dampers and diffusers decide the fan pressure, and sometimes the duct size.
- It ignores insulation and lining. Sizes here are internal. External insulation adds to the space a duct takes, and internal acoustic lining reduces the free area.
- It does not check the construction. Sheet thickness, joints, seams, reinforcement and supports come from the construction standard the project specifies, such as IS 655 or the SMACNA HVAC Duct Construction Standards.
- It does not lay out the system. Branch takeoffs, balancing and diffuser selection are separate design steps.
- It handles one section at a time. Every change in airflow along a run needs its own size.
Worked example
A main supply duct carrying 2,000 cfm at a design velocity of 5 m/s, with a 2 : 1 aspect ratio and sizes rounded up to the next 50 mm:
| Step | Calculation | Result |
|---|---|---|
| Airflow | 2,000 × 0.000471947 | 0.944 m³/s (944 L/s, 3,398 m³/h) |
| Area | 0.944 / 5 | 0.1888 m² |
| Round diameter | √(4 × 0.1888 / π) | 490 mm, rounded up to 500 mm |
| Rectangular height | √(0.1888 / 2) | 307 mm, rounded up to 350 mm |
| Rectangular width | 2 × 307 | 614 mm, rounded up to 650 mm |
| Velocity in 650 × 350 mm | 0.944 / (0.65 × 0.35) | 4.15 m/s |
| Equivalent round diameter | 1.30 × (650 × 350)^0.625 / (650 + 350)^0.25 | 515 mm |
The result is a 500 mm round duct (19.7 in), in which the air moves at 4.81 m/s, or a 650 × 350 mm rectangular duct (25.6 × 13.8 in), in which it moves at 4.15 m/s (817 fpm). The rectangle's equivalent round diameter is 515 mm (20.3 in): rounding both sides up has given it slightly less friction than the 500 mm round duct.
If the ceiling void is too shallow for a 350 mm duct plus insulation and supports, a 4 : 1 aspect ratio gives 900 × 250 mm, at 4.20 m/s, for the same airflow. If the duct runs over a quiet room and the velocity is cut to 4 m/s, the sizes grow to 550 mm round or 700 × 350 mm.
How engineers use it
An HVAC engineer starts from the airflows set by the heat-load and ventilation calculations, lays out the duct routes against the structure, the ceiling and the other services, and then sizes each section. Low-pressure supply duct is usually sized for a constant friction loss per metre, with velocities checked against limits for noise; long runs may be sized by static regain so pressure stays even along the run. The sizes then go into coordination with sprinklers, cable trays and lighting, and the pressure loss of the worst run sets the fan.
A velocity-method size is still useful to the engineer at concept stage, to check whether a ceiling void or a shaft is deep enough before the layout is drawn.
When a professional design must replace it
Use the calculator to test ceiling depths, check a duct on a drawing against its airflow, and compare round and rectangular options. Replace it with a duct design by an HVAC engineer before ductwork is fabricated or ordered, wherever noise matters, wherever the fan pressure is tight, and for any duct that is part of a smoke control or pressurisation system, which has its own design requirements.
Standards referenced
- ASHRAE Handbook — Fundamentals — Duct design (ASHRAE)
- SMACNA HVAC Duct Construction Standards — Metal and flexible duct construction (SMACNA)
- IS 655 — Metal air ducts — specification (Bureau of Indian Standards)
Frequently asked
Related
- GI Duct — Gauge, Construction and Leakage Class
- GI Duct vs Pre-Insulated Duct: Space, Leakage and Site Programme
- Air Handling Unit: What an AHU Does and What It Needs
- Ventilation Calculator: Fresh Air by ASHRAE 62.1 and by Air Changes
- AC Tonnage Calculator: Screening the Cooling Load of an Office
- Office HVAC Problems After Handover
More in Calculators
- Facade Glazing Calculator: Vision Glass, Spandrel and WWR
- Meeting Room Size Calculator: Room Dimensions from the Table
- Office Seat Capacity Calculator: How Many People Fit in a Floor?
- Pump Head Calculator: Total Head and Motor Power for a Transfer Pump