Office Space Planner: How Much Area Does Your Team Need?
An office space planner turns a headcount and a list of rooms into the carpet area a team needs, then adds the building's loading to give the chargeable area to lease. It is a briefing tool for shortlisting buildings, not a layout.
By Dhruv Agarwal · · 5 min read
Office space planner
100% means one desk for every open-plan person. Lower it for hybrid working.
Assumptions (edit to match your project)
Corridors and walkways between the spaces above, added on top of them.
Chargeable area = carpet × (1 + loading). Ask the landlord for the real figure.
Carpet area needed
4,650 sq ft
432 m²
Chargeable area to lease
6,045 sq ft
At 30% loading
Workstations
46
46 open-plan staff
Carpet area per person
93 sq ft
Includes a share of every space
| Workstations (46 × 45) | 2,070 sq ft |
| Cabins (4 × 120) | 480 sq ft |
| Meeting rooms and boardroom | 540 sq ft |
| Reception, pantry, IT and storage | 630 sq ft |
| Circulation (25%) | 930 sq ft |
| Carpet area | 4,650 sq ft |
How this was calculated
- Workstations = ceil(46 open-plan staff × 100%) = 46
- Net area = 2,070 + 480 + 540 + 630 = 3,720 sq ft
- Carpet = 3,720 × (1 + 25%) = 4,650 sq ft
- Chargeable = 4,650 × (1 + 30%) = 6,045 sq ft
- Washrooms are assumed to be in the building core, outside your carpet area.
Send this result on WhatsApp
Your figures go with the message, so our team can reply on them directly.
Send on WhatsAppIndicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.
What it calculates
The planner answers the first question in any office move: how big a floor should we be looking at? It takes the people and rooms you need and returns four figures:
- the number of workstations, after cabins and any hybrid sharing;
- the carpet area the team needs, including circulation;
- the chargeable area you are likely to lease once the building's loading is added;
- the carpet area for each person, a quick check against typical office density.
It also shows where the area goes, so you can see whether meeting rooms, cabins or desks are driving the total.
Inputs
Total headcount is everyone who needs a place in the office, including people in cabins.
People in private cabins are taken out of the open-plan count and given a cabin each.
Open-plan staff in office on a peak day sets how many desks are provided. Keep it at 100% for one desk each. Lower it if the team works hybrid and not everyone is in on the same day.
Small meeting rooms and boardrooms are counted separately because they differ a lot in size.
The assumptions panel holds the area given to each type of space, the circulation allowance and the building loading. Every one of them can be changed.
Method
The planner builds the area up from the spaces, then adds circulation, then adds loading:
- Workstations = open-plan staff × peak attendance, rounded up.
- Net area = workstations + cabins + meeting rooms + reception, pantry, IT and storage.
- Carpet area = net area × (1 + circulation allowance).
- Chargeable area = carpet area × (1 + loading).
The pantry allowance is applied to the whole headcount, since everyone uses it. The reception, IT and storage figures are fixed areas you can edit.
Assumptions
| Space | Default | What it covers |
|---|---|---|
| Workstation | 45 sq ft | Desk, chair and the space to pull the chair out |
| Cabin | 120 sq ft | A single-person cabin with a small meeting table |
| Small meeting room | 120 sq ft | Four to six seats |
| Boardroom | 300 sq ft | Ten to twelve seats |
| Reception and waiting | 150 sq ft | Desk and a few visitor seats |
| Pantry and breakout | 6 sq ft for each person | Counter, seating and storage |
| Server / IT room | 80 sq ft | A rack or two and the UPS |
| Storage, print and records | 100 sq ft | Shared storage and the print area |
| Circulation | 25% | Corridors and walkways between spaces |
| Loading | 30% | Common areas charged on top of carpet |
These are planning allowances, not standards. A sales team on compact desks needs less; a leadership floor with large cabins needs far more. Change them to suit how your team works.
Loading varies from building to building and is a lease term, so the 30% default is only a placeholder until the landlord gives you the real figure.
Limitations
- It does not draw a layout. Columns, the core, the shape of the floor and the window line all affect how much of the carpet area is usable. A deep or irregular floor can need noticeably more area for the same team.
- It assumes washrooms are in the core. If your tenancy has its own washrooms, add them.
- It does not check fire escape. More people on a floor means a higher occupant load, which affects exit widths and travel distances under NBC 2016 Part 4. That is a check for the fire consultant on the actual building.
- It does not allow for growth. If the team will grow during the lease, enter the headcount you expect at the end of it, or the peak in between.
Worked example
A team of 50, with 4 people in cabins, everyone in the office on the busiest day, two small meeting rooms and one boardroom, using the default assumptions:
| Step | Calculation | Result |
|---|---|---|
| Open-plan staff | 50 − 4 | 46 |
| Workstations | 46 × 100%, rounded up | 46 |
| Workstation area | 46 × 45 | 2,070 sq ft |
| Cabins | 4 × 120 | 480 sq ft |
| Meeting rooms | 2 × 120 + 1 × 300 | 540 sq ft |
| Reception, pantry, IT, storage | 150 + 50 × 6 + 80 + 100 | 630 sq ft |
| Net area | 2,070 + 480 + 540 + 630 | 3,720 sq ft |
| Carpet area | 3,720 × 1.25 | 4,650 sq ft |
| Chargeable area | 4,650 × 1.30 | 6,045 sq ft |
That is about 93 sq ft of carpet area for each person. In practice this team would be looking at floors of roughly 6,000 sq ft chargeable, and would ask each landlord for the carpet area before shortlisting.
If the same team moves to hybrid working with 70% of open-plan staff in on the busiest day, the workstations drop to 33 and the carpet area falls to 3,919 sq ft, about 16% less.
How engineers use it
A designer uses a calculation like this at the briefing stage, before any building has been chosen. It turns a conversation about headcount into an area brief, and it makes the trade-offs visible: dropping one cabin or one boardroom has a direct, measurable effect on the floor size and therefore on rent.
Once a building is shortlisted, the brief becomes a test fit: a quick layout on the real floor plate. The test fit confirms whether the room list fits, where the cabins can sit against the window line, and whether the core position wastes area. It also feeds the next calculations: cooling load is sized on the carpet area, and lighting is designed room by room.
When a professional design must replace it
Use the planner to decide how big a floor to look for and to compare buildings. Replace it with a designer's test fit before you sign a lease, and with a full layout before you order furniture or start any work. The test fit is also where fire escape, accessible routes and the building's own fit-out rules are checked against the real floor.
Standards referenced
- NBC 2016, Part 4 — Fire and life safety: occupant load and means of egress (Bureau of Indian Standards)
- RERA 2016 — Section 2(k): definition of carpet area (Legislative Department, Ministry of Law and Justice)
Frequently asked
Related
- Carpet Area Calculator: Carpet, Built-Up and Super Built-Up
- Workstation Density: Square Feet per Person
- Carpet, Built-Up and Super Built-Up Area: What You Actually Pay For
- Office Layout Efficiency
- Fit-Out Timeline Calculator: How Long Will Your Office Take?
- AC Tonnage Calculator: Screening the Cooling Load of an Office