Carpet, Built-Up and Super Built-Up Area: What You Actually Pay For

Carpet area is the usable floor you can actually lay carpet on; built-up area adds the walls; super built-up (or chargeable) area adds a share of lobbies, lifts, staircases and services. Rent is usually quoted on super built-up, while fit-out is priced on carpet — which is why the two numbers must never be mixed up.

By Dhruv Agarwal · · 2 min read

Why it matters on a fit-out project

This is the most common source of budget confusion on Indian office projects, and it usually surfaces at the worst moment — when a fit-out quote arrives and appears far higher per square foot than expected.

Often nothing is wrong with the quote. The tenant is comparing a rate priced on carpet area against a floor plate they think of in super built-up terms. On a 30% loading factor, the same total cost looks 30% more expensive per square foot simply because of which denominator is used.

How it is specified in practice

TermWhat it includesNormally used for
Carpet areaUsable floor inside the wallsFit-out pricing, furniture layout, seat counts
Built-up areaCarpet plus internal and external wallsConstruction and structural discussion
Super built-up / chargeableBuilt-up plus a share of common areasRent, maintenance charges, deposits

Loading factor is the gap between carpet and chargeable area, expressed as a percentage. A 10,000 sq ft chargeable floor at 30% loading gives roughly 7,700 sq ft of carpet — and that smaller number is what your fit-out, your workstation count and your HVAC tonnage are all actually based on.

Common mistakes

  • Comparing two fit-out quotes on different bases. If one contractor prices on carpet and another on chargeable, the cheaper-looking rate can be the more expensive job. Always confirm the denominator before comparing.
  • Planning headcount from chargeable area. Seat counts come from carpet area. Using the leased figure overstates capacity by the whole loading factor.
  • Assuming loading is standardised. It is not. It varies building to building and is a negotiable lease term.
  • Sizing HVAC on the wrong number. Cooling load follows the space you actually occupy and condition. Using chargeable area oversizes the plant and wastes both capital and running cost.
  • Not getting the definition written into the lease. Terms vary between landlords. The lease should define exactly what is included, not rely on the common meaning.

Standards referenced

RERA 2016, Section 2(k), gives the statutory definition of carpet area: the net usable floor area within a unit, excluding external walls, service shafts, balconies and verandas, but including internal partition walls.

Standards referenced

  • RERA 2016 — Section 2(k) — definition of carpet area (Legislative Department, Ministry of Law and Justice)

Frequently asked

Grade-A commercial buildings commonly load somewhere between 25% and 40%, meaning carpet area is roughly 60-75% of the chargeable area you pay rent on. Older or more efficient buildings sit at the lower end; towers with large lobbies, deep cores and generous common areas sit at the upper end. It is a negotiable, building-specific number, not a standard.

Carpet area, always, and the quote should say so explicitly. Fit-out work happens inside your demised space — you do not fit out the lift lobby. A rate quoted per square foot of super built-up area is either a mistake or a way of making a number look lower than it is.

RERA 2016 defines carpet area precisely and applies to the sale of registered projects, including commercial ones. Ordinary commercial leasing is governed by the lease itself rather than RERA, which is exactly why the lease must define its own terms — a landlord's definition of built-up area is not automatically the RERA one.

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback