DGU: What Goes Into a Double Glazed Unit

A double glazed unit is two panes of glass separated by a sealed, dried air or argon cavity held apart by a spacer bar. The cavity is what insulates; the edge seal is what keeps the cavity dry, and when that seal fails the unit fogs permanently.

By Dhruv Agarwal · · 2 min read

Why it matters on a project

Most conversations about DGU are about the glass. Most DGU failures are about the edge.

The two panes and the coating determine how the unit performs on day one. The spacer, the desiccant and the primary and secondary seals determine whether it still performs in year twelve — or whether it has fogged and has to be replaced at height, on a sealed facade, at many times its original cost.

How it is specified in practice

ComponentTypical positionWhy
Outer pane6-12mm, coated on surface 2Coating reflects solar gain, protected inside the cavity
Cavity12-16mm, air or argonBelow 12mm insulates poorly; above 16mm gains little
SpacerAluminium or warm-edge polymerWarm edge cuts the thermal bridge at the perimeter
DesiccantInside the spacerAbsorbs residual moisture so the cavity stays clear
Primary sealPolyisobutyleneThe actual gas and vapour barrier
Secondary sealSilicone or polysulphideStructural bond holding the unit together
Inner pane6-10mm, often toughenedSafety requirement depends on location and use

Common mistakes

  • Specifying glass and ignoring the edge seal. The unit's service life is set by seal quality, not by the coating.
  • Using polysulphide behind structural silicone glazing. Silicone secondary seal is required where the DGU is structurally bonded; polysulphide is not compatible with that application.
  • Skipping setting blocks or placing them wrong. The unit must sit on correctly positioned blocks. Point loads at the edge crack glass and stress the seal.
  • Sealing the glazing rebate with no drainage. Water sitting in the rebate attacks the secondary seal — one of the most common causes of early fogging in Indian monsoon conditions.
  • Assuming argon is always worth it. It gives a modest gain and leaks slowly over time. Coating choice usually delivers more per rupee in a cooling climate.

Standards referenced

Fenestration U-value and SHGC targets by climate zone are set by ECBC 2017. Safety glass requirements, including where toughened or laminated panes are mandatory, follow IS 2553 (Part 1).

Standards referenced

  • ECBC 2017 — Building envelope — fenestration (Bureau of Energy Efficiency)
  • IS 2553 (Part 1) — Safety glass — architectural (Bureau of Indian Standards)

Frequently asked

It is worth it for air-conditioned commercial buildings, and ECBC targets in most climate zones are difficult to meet with single glazing. The gain is different from a cold climate though — here DGU mainly cuts cooling load and stops condensation on the inner pane, rather than retaining heat. For naturally ventilated buildings the payback is weak.

For solar control in a cooling climate, the low-E or solar control coating normally sits on surface 2 — the cavity-facing side of the outer pane — so it reflects solar energy before it enters the cavity. Coatings are also fragile and belong inside the sealed cavity, not on an exposed face.

Almost always edge seal failure. The desiccant inside the spacer absorbs residual moisture, but once the seal is breached it saturates and moisture condenses inside the cavity. It cannot be cleaned or repaired — the unit is replaced. This is why edge seal quality and correct setting blocks matter far more than the headline glass specification.