Thermal Break: Why Aluminium Windows Sweat Without One

A thermal break is an insulating strip — usually polyamide — bonded between the inner and outer halves of an aluminium profile, so heat cannot conduct straight through the frame. Without it, the frame is a continuous metal bridge between outside and inside.

By Dhruv Agarwal · · 2 min read

Why it matters on a project

Aluminium is roughly a thousand times more conductive than the polyamide strip that breaks it. That single fact is why an unbroken aluminium frame behaves like a heat pipe through the wall — and why, in a chilled office in a humid Indian summer, water appears on the inside face of the frame while the glass stays clear.

Occupants read that as a leak. It is not; it is condensation on a cold metal surface, and it is a specification decision made months earlier.

How it is specified in practice

ParameterTypical positionWhy
Break materialPolyamide 6.6, glass-fibre reinforcedLow conductivity, and strong enough to be structural
Break depthCommonly 14-34mmDeeper break, better performance and higher cost
AssemblyRolled-in and knurled, factoryThe composite must act as one section structurally
Alloy6063 T6Standard architectural extrusion alloy
GasketEPDMDurable under UV and thermal cycling
VerificationSystem U-value from the system supplierFrame performance is a tested property, not a claim

Common mistakes

  • Specifying thermally broken glass and a plain frame. Paying for high-performance DGU and then bridging the assembly with bare aluminium wastes most of the benefit at the frame.
  • Assuming it is only for cold climates. In India the driver is usually cooling load and condensation control, not heating.
  • Ignoring the break depth. "Thermally broken" covers a wide performance range. A 14mm break and a 34mm break are not the same product.
  • Breaking the frame and forgetting the fixing. Steel brackets bridging around the break reintroduce the path the break was meant to interrupt.
  • Mixing systems. Profile, gasket, hardware and drainage are designed as one assembly. Substituting one part of it invalidates the tested performance.

Where Hagerstone uses it

Our fenestration work runs on engineered systems rather than assembled parts. As a strategic partner, Winda Window Systems supplies aluminium and uPVC window and door systems manufactured in Ludhiana as a single engineered assembly — profile, hardware, gasket, drainage and glass — using 6063 T6 alloy, EPDM gaskets and EN-certified hardware.

Standards referenced

Fenestration U-value requirements by climate zone are set by ECBC 2017. Architectural aluminium extrusion alloy and temper are covered by IS 733.

Standards referenced

  • ECBC 2017 — Building envelope — fenestration U-value (Bureau of Energy Efficiency)
  • IS 733 — Wrought aluminium alloy bars, rods and sections (Bureau of Indian Standards)

Frequently asked

For an air-conditioned building, yes — the physics runs both ways. A non-broken frame conducts heat inwards all summer and adds to the cooling load, and its inside face runs cold enough in a chilled office to attract condensation in humid weather. The case is strongest for conditioned commercial space and weakest for naturally ventilated buildings.

The frame component improves substantially — a thermally broken aluminium frame typically performs several times better than the same profile without one. Whole-window U-value improves less dramatically, because glass usually dominates the area. The frame matters most on heavily subdivided fenestration where framing takes a large share of the opening.

No. It is created during extrusion and assembly — polyamide strips are rolled into channels in two separate profiles to make one composite section. A profile is either designed as thermally broken or it is not; there is no retrofit.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback