Epoxy Floor Coating Calculator: Litres, Kilograms and Kits
An epoxy or PU floor coating quantity follows from the floor area, the thickness of each coat and the product's volume solids: litres = area in m² × dry thickness in mm ÷ volume solids. One square metre at 1 mm of a 100% solids product takes one litre. Kilograms are litres multiplied by the mixed density.
By Dhruv Agarwal · · 4 min read
Epoxy floor coating calculator
In the unit chosen below.
Fills starting figures for coats, thickness, solids and density, all editable.
Body coats only. Primer is counted separately.
150 µm = 0.15 mm. For self-levelling, the layer thickness.
Assumptions (edit to match your project)
From the product data sheet. Solvent-free systems are close to 100%.
From the product data sheet. Filled self-levelling products are denser.
If the data sheet gives consumption, enter it here and it replaces the thickness method. 0 to use thickness.
From the primer data sheet; porous concrete takes more. 0 if no primer.
Material left in kits and tools, surface roughness and porosity.
Coating
38.3 L
49.8 kg, including 10% wastage
Kits
4
10 L each
Primer
20.4 L
3 pack(s) of 10 L
Floor area
92.9 m²
1,000 sq ft
| Wet film per coat (dry ÷ volume solids) | 0.1875 mm |
| Consumption per coat | 0.244 kg/m² |
| Coating before wastage | 34.84 L, 45.29 kg |
| Coating with 10% wastage | 38.32 L, 49.82 kg |
| Primer with wastage | 20.44 L |
How this was calculated
- Area = 1,000 sq ft × 0.0929 = 92.9 m²
- Litres = area × thickness × coats ÷ volume solids (1 m² at 1 mm of a 100% solids product = 1 L)
- Litres = 92.9 × 0.15 × 2 / 0.8 × 1.1 = 38.32 L
- kg = 38.32 × 1.3 kg/L = 49.82 kg
- Kits = ceil(38.32 / 10) = 4
- Primer = 92.9 / 5 × 1.1 = 20.44 L
Send this result on WhatsApp
Your figures go with the message, so our team can reply on them directly.
Send on WhatsAppIndicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.
What it calculates
For an epoxy or PU floor coating, the calculator gives:
- the coating quantity in litres and kilograms, for the coats and thickness chosen;
- the number of kits to order, in litres or kilograms;
- the primer quantity and packs;
- the wet film per coat and the consumption per coat in kg/m², to compare with the product data sheet.
Inputs
Floor area is in square feet or square metres, as chosen in Area unit.
System chooses a thin roller-applied coat or a self-levelling coat. It fills starting figures for the coats, thickness, volume solids and density, all of which you can change.
Number of coats counts body coats only; the primer is separate.
Dry film or layer thickness per coat is in millimetres. Data sheets often give film thickness in microns: 150 µm is 0.15 mm.
The assumptions panel holds the volume solids, mixed density, an optional data-sheet consumption, primer coverage, kit and pack sizes and the wastage allowance.
Method
The core relation is that one square metre at 1 mm thickness is one litre:
- Area in m² = sq ft × 0.0929.
- Litres = area × dry thickness per coat × coats ÷ volume solids × (1 + wastage).
- Kilograms = litres × mixed density.
- Kits = litres (or kilograms) ÷ kit size, rounded up.
- Primer = area ÷ primer coverage × (1 + wastage).
If a data-sheet consumption is entered, kilograms = area × consumption × coats × (1 + wastage), and litres = kilograms ÷ density.
Volume solids is measured to methods such as ISO 3233-1 and density to methods such as ISO 2811-1; the data sheet states the figure and method. Resin floor screeds are classified under EN 13813.
Assumptions
| Assumption | Default | Notes |
|---|---|---|
| Thin coat | 2 coats × 0.15 mm dry | Illustrative; use the system specification |
| Thin coat volume solids | 80% | Replace with your product's data sheet |
| Thin coat density | 1.3 kg/L | Replace with your product's data sheet |
| Self-levelling | 1 coat × 2 mm | Illustrative; use the system specification |
| Self-levelling volume solids | 100% | Replace with your product's data sheet |
| Self-levelling density | 1.6 kg/L | Replace with your product's data sheet |
| Primer coverage | 5 m² a litre | Replace with your primer's data sheet; porous concrete takes more |
| Kit and primer pack size | 10 L | Replace with the pack sizes supplied |
| Wastage | 10% | Material left in kits and tools, surface roughness and porosity |
Limitations
- Surface preparation is not included. Grinding or shot-blasting, crack and joint repair, moisture testing and any levelling screed are separate items.
- Broadcast and filled systems such as sand-broadcast or quartz-filled floors use aggregate and resin in proportions the manufacturer sets; use its consumption figures.
- Porous or rough substrates take more primer and more of the first coat than a smooth floor. Raise the wastage or primer quantity accordingly.
- Skirting coves, upstands, drains and trenches add area that is not in a flat floor measurement.
- Performance is not checked. Thickness, chemical and abrasion resistance and slip resistance belong to the system specification, not to this calculation.
Worked example
A 1,000 sq ft floor with the thin-coat system: two coats of 0.15 mm dry at 80% volume solids, density 1.3 kg/L, 10 L kits, primer at 5 m² a litre in 10 L packs and 10% wastage:
| Step | Calculation | Result |
|---|---|---|
| Area | 1,000 × 0.0929 | 92.9 m² |
| Wet film per coat | 0.15 ÷ 0.80 | 0.1875 mm |
| Coating before wastage | 92.9 × 0.15 × 2 ÷ 0.80 | 34.84 L |
| Coating with wastage | 34.84 × 1.10 | 38.32 L |
| Mass | 38.32 × 1.3 | 49.82 kg |
| Kits | 38.32 ÷ 10, rounded up | 4 |
| Primer | 92.9 ÷ 5 × 1.10 | 20.44 L, 3 packs |
The floor needs about 38.3 litres (49.8 kg) of coating in 4 kits, and 20.4 litres of primer. Each coat works out at about 0.244 kg/m², the figure to compare with the data sheet. Switching to the self-levelling system at 2 mm, 100% solids and 1.6 kg/L gives 204.39 litres, or 327.02 kg, for the same floor.
How engineers use it
On an industrial or commercial floor, the flooring specification names the system: primer, any scratch or levelling coat, body coats or self-levelling layer, broadcast and top coat, each with a thickness or consumption. Quantities are taken off for each layer from the manufacturer's figures for the substrate and finish, and the contractor plans kits so each mix can be laid within its working time.
When a professional design must replace it
Use the calculator to estimate material or check a supplier's quantities for a simple floor. Replace it with the manufacturer's or flooring designer's system specification before ordering, and wherever the floor carries forklifts or heavy loads, chemicals, hot washing, wet processes or food and pharmaceutical hygiene requirements, or sits on a slab with moisture or cracking problems. The system specification decides the build-up, not a rule of thumb.
Standards referenced
- ISO 3233-1 — Paints and varnishes — determination of the percentage volume of non-volatile matter (ISO)
- ISO 2811-1 — Paints and varnishes — determination of density — pycnometer method (ISO)
- EN 13813 — Screed material and floor screeds — screed material — properties and requirements (CEN-CENELEC)
Frequently asked
Related
- Epoxy Flooring — Coatings, Self-Levelling and Screeds
- PU Concrete Flooring for Food, Pharma, Cold Stores and Wet Areas
- Epoxy vs Vinyl for Industrial Floors: Chemicals, Traffic and Downtime
- Self-Levelling Underlayment (Compound) for Vinyl, LVT and Carpet Tile Floors
- Industrial Flooring and Hardstanding: Designing for What Runs On It
- Office Flooring — Carpet Tile, Vinyl, Stone and Raised Access
More in Calculators
- Glass Partition Calculator: Panels, Doors, Channels and Film
- Gypsum False Ceiling Calculator: Boards, Channels and Hangers
- Office Fit-Out Budget Calculator: Build a Budget from Your Own Figures
- Office Occupancy Cost Calculator: Total Cost for Each Seat a Month