Epoxy Flooring — Coatings, Self-Levelling and Screeds
Epoxy flooring is a resin flooring system applied to a concrete substrate, ranging from a thin sealing coat through self-levelling layers to a thick trowelled screed, with the system and thickness chosen by duty. Whether it lasts depends mainly on mechanical surface preparation and a dry slab; most epoxy failures are preparation failures.
By Dhruv Agarwal · · 1 min read
What it is
A resin flooring system applied to a concrete substrate, ranging from a thin sealing coat to a thick trowelled screed.
| System | Thickness | Duty |
|---|---|---|
| Coating | 0.2 — 0.5mm | Dust sealing, light foot traffic |
| Self-levelling | 2 — 3mm | General industrial, forklift traffic |
| Trowelled screed | 4 — 9mm | Heavy impact, chemical, thermal cycling |
| Anti-static | Varies | Electronics, clean rooms |
Preparation is the specification
The finish is only as good as what it is stuck to. Required, not optional:
- Mechanical preparation — shot blasting or diamond grinding to remove laitance and open the surface
- Moisture testing to the system's stated limit before any resin is applied
- Crack and joint treatment, since movement joints must be carried through the resin, not covered over
- Edge and upstand detailing, including coving where hygiene requires it
Most epoxy failures are preparation failures, and they are visible within months as peeling, bubbling or delamination in traffic lanes.
Where projects go wrong
- Acid etching instead of mechanical preparation.
- Applied to a green or damp slab. Concrete needs its drying time.
- Movement joints bridged, so the floor cracks where the slab moves.
- System thickness below the duty, wearing through in aisles.
- Applied in poor ambient conditions, since cure depends on temperature and humidity.
- Standard epoxy in daylight, which yellows.
Standards referenced
Concrete substrate requirements under IS 456:2000. Screed material classification under EN 13813. Concrete protection products under EN 1504.
Standards referenced
- IS 456:2000 — Plain and reinforced concrete — code of practice (Bureau of Indian Standards)
- EN 13813 — Screed material and floor screeds (CEN-CENELEC)
- EN 1504 — Products for protection and repair of concrete structures (CEN-CENELEC)
Frequently asked
Related
More in Materials
- Expanded Polystyrene (EPS) Insulation and Core
- Extruded Polystyrene (XPS) Insulation Board
- Fibre Cement Board for Facade and Interior Use
- Fire Dampers — Types, Ratings and Installation