Fire Dampers — Types, Ratings and Installation

A fire damper is a closure device inside ductwork at the point it crosses a fire compartment boundary, restoring the fire resistance of the wall or floor the duct passes through. A fire damper closes on heat via a fusible link; a fire-smoke damper is motorised and closes on a signal from the fire alarm.

By Dhruv Agarwal · · 1 min read

What it is

A closure device inside ductwork at the point it crosses a fire compartment boundary, restoring the fire resistance of the wall or floor it passes through.

Types

TypeActuationTypical use
Fire damperFusible link, heatGeneral compartment crossings
Fire-smoke damperMotorised, alarm signalEscape routes, pressurisation
Smoke damperMotorised, detectionSmoke control systems
Ceiling radiation damperHeatCeiling penetrations in rated floors

Specification at a glance

PropertyTypical specification
RatingMatches the wall or floor rating — 60, 120 minutes
StandardEN 15650 or UL 555
Link temperatureCommonly 72°C for fire dampers
FramePurpose-made installation frame, built into the wall
ActuatorSpring-return on motorised types
AccessPanel sized and positioned to reach the damper

Installation is where the rating lives

A correctly rated damper installed badly gives no protection at all:

  • The damper must be built into the wall on its installation frame, not hung off the duct beside it
  • The gap around the frame must be fire-stopped with a tested system
  • The duct must be able to fall away in a fire without pulling the damper out
  • An access panel must reach the damper for testing and resetting
  • Links and blades must be clear of paint and free to move

Where projects go wrong

  • No access panel. The damper can never be tested or reset.
  • Fixed to the duct, not the wall.
  • Fire stopping done with general-purpose sealant rather than a tested system.
  • Rating lower than the wall it penetrates.
  • Fire-smoke damper specified but wired to nothing, so it never closes on alarm.

Standards referenced

Compartmentation and services provisions under NBC 2016, Part 4. Fire damper requirements under EN 15650 and UL 555.

Standards referenced

  • NBC 2016, Part 4 — Fire and life safety — compartmentation and services (Bureau of Indian Standards)
  • EN 15650 — Ventilation for buildings — fire dampers (CEN-CENELEC)
  • UL 555 — Standard for fire dampers (UL Standards & Engagement)

Frequently asked

Because a duct passing through a compartment wall punches a hole in the fire separation the building's fire strategy depends on. Without a damper, fire and smoke travel freely from one compartment to the next through the ductwork, defeating the compartmentation entirely. The damper restores the rating of the wall at the point the duct crosses it.

A fire damper closes on heat, usually via a fusible link that melts at a set temperature, and it stops flame spread. A fire-smoke damper closes on a signal from the fire alarm or smoke detection system, so it acts on smoke long before temperatures rise. Since smoke kills before fire reaches most people, escape routes and pressurisation systems typically require the motorised fire-smoke type.

Almost always installation rather than the damper itself. The most common defects are no access panel to reach the damper, the damper fixed to the duct instead of built into the wall with a proper installation frame, the gap around the frame not fire-stopped correctly, and links painted over during finishing so they can never release. All four are invisible once the ceiling closes.

Related

More in Materials

All Materials →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback