Galvalume Sheet — Coating, Grades and Service Life

Galvalume is cold-rolled steel sheet coated with an aluminium-zinc alloy of nominally 55% aluminium, 43.5% zinc and 1.5% silicon, supplied bare or pre-painted as PPGL for roofing and wall cladding. Its service life is decided mainly by coating mass, stated as an AZ class such as AZ150.

By Dhruv Agarwal · · 2 min read

What it is

Cold-rolled steel sheet coated with an aluminium-zinc alloy, nominally 55% aluminium, 43.5% zinc and 1.5% silicon. Supplied bare, or pre-painted as PPGL for a coloured finish.

It is the default substrate for industrial roofing and wall cladding across Indian PEB construction.

Specification at a glance

PropertyTypical specification
StandardIS 15961 or ASTM A792
Coating massAZ70 / AZ100 / AZ150 and above
Base steel yield345 MPa and 550 MPa grades common
Thickness0.45mm — 0.80mm TCT for roofing
FinishBare Galvalume, or pre-painted PPGL
Paint systemPolyester, SMP or PVDF by exposure

TCT means total coated thickness — always confirm whether a quoted thickness is TCT or base metal thickness, because the difference is real money.

Why coating mass is the specification that matters

Two sheets can both be "Galvalume" and differ in service life by many years. The variable is coating mass:

CoatingIndicative use
AZ70Sheltered, low-exposure, short-life structures
AZ100General inland industrial
AZ150Standard for durable industrial roofing
AZ200 and aboveCoastal, chemically aggressive, long-design-life

What drives the cost

Base metal thickness · coating mass · steel grade · bare versus pre-painted · paint resin class, with PVDF above SMP above polyester · profile and rib depth · sheet length and transport.

Where projects go wrong

  • Coating mass unspecified. The most common and most expensive omission.
  • Thickness quoted as TCT and read as base metal. A 0.50mm TCT sheet is thinner in steel than a 0.50mm base metal sheet.
  • Cut edges and swarf left on the roof. Drilling swarf rusts in place and stains and pits the sheet. It must be swept at the end of every shift.
  • Contact with wet concrete, copper or lead. Each drives accelerated corrosion; isolate the interfaces.
  • Fastener spacing uniform across the roof. Edges, corners and ridges see higher suction under IS 875 Part 3 and need closer spacing.

Standards referenced

Aluminium-zinc coated sheet under IS 15961 and ASTM A792. Wind loading on roof and wall cladding to IS 875 (Part 3).

Standards referenced

  • IS 15961 — Steel sheet, aluminium-zinc alloy metallic coated (Bureau of Indian Standards)
  • ASTM A792 — Steel sheet, 55% aluminium-zinc alloy-coated (ASTM International)
  • IS 875 (Part 3) — Wind loads — roof and wall cladding (Bureau of Indian Standards)

Frequently asked

Galvanised sheet is coated with zinc alone. Galvalume is coated with an alloy of roughly 55% aluminium, 43.5% zinc and 1.5% silicon. The aluminium gives far better atmospheric corrosion resistance and heat reflectivity, while the zinc retains sacrificial protection at cut edges. For industrial roofing in India, Galvalume typically outlasts equivalent galvanised sheet by a wide margin.

Name it explicitly, for example AZ150, which means 150 grams per square metre of alloy coating counted over both surfaces. Lighter coatings such as AZ70 cost less and corrode sooner. Coastal, industrial and high-humidity sites should be at AZ150 or above. A specification that says only Galvalume without a coating mass is unenforceable.

With a higher coating mass and a pre-painted finish, yes, but it is not immune. Within a few kilometres of the sea, chloride loading is severe and a bare Galvalume roof will have a shorter life than inland. Pre-painted grades with a suitable paint system, generous coating mass and correct detailing at cut edges are the practical answer.