PEB Roofing & Wall Cladding
PEB roofing and wall cladding is the metal envelope of an industrial building: single-skin sheeting or PIR and rock wool insulated panels, with skylights, ventilators, flashings and gutters. Single-skin versus insulated panel sets the heat gain, while most roof leaks come from fasteners, laps and penetrations rather than the sheet itself.
By Dhruv Agarwal · · 1 min read
What we deliver
Roof and wall sheeting, insulated sandwich panels, skylights, ventilators, flashings and gutters for PEB and industrial buildings — the envelope that decides how hot the building runs and whether it stays dry.
On an industrial building the envelope is most of the building's surface area, and the roof takes the most sun. Its specification sets the inside temperature, the lighting load and the running cost for as long as the building stands.
Scope of works
| Element | What we deliver |
|---|---|
| Roof sheeting | Single-skin or insulated panel, fixed to purlins |
| Wall cladding | Sheeting or insulated panel on girts |
| Insulation | PIR or rock wool panels where specified |
| Daylighting | Polycarbonate or FRP skylight sheets |
| Ventilation | Turbo ventilators, ridge vents, louvres |
| Rainwater | Gutters, downpipes, valley details |
| Flashings | Ridges, eaves, corners, penetrations |
Where projects go wrong
- Fastener spacing uniform across the roof. Edges and corners need closer spacing for wind uplift.
- Laps not sealed or too short. The most common cause of industrial roof leaks.
- Penetrations poorly flashed. Every ventilator and pipe is a potential leak.
- Skylights without insulation strategy. They bring daylight and heat.
- Gutters undersized. A large roof sheds a great deal of water quickly.
Why Hagerstone
Envelope experience across industrial and commercial work — our Director – Facade has led PIR panel and rock wool panel envelope projects, including 6,500 sq. m. at the Anygraphics factory in Noida — so roofing is detailed by people who handle insulated envelopes, not only sheeting.
In-house fitters and a 53-member site team, under ISO 9001 / 14001 / 45001 and 79+ quality checkpoints.
Standards referenced
Wind loading on roof and wall cladding to IS 875 (Part 3). Galvanised steel sheet to IS 277. Roof and wall assembly performance under ECBC 2017.
Standards referenced
- IS 875 (Part 3) — Wind loads — roof and wall cladding (Bureau of Indian Standards)
- IS 277 — Galvanised steel sheets (Bureau of Indian Standards)
- ECBC 2017 — Building envelope — roof and wall assembly (Bureau of Energy Efficiency)
Frequently asked
Related
More in PEB Structures
- Crane Gantry and Material Handling: Designing the Frame Around the Lift
- PEB Erection and Site Works: Where Steel Programmes Slip
- PEB Insulation and Thermal Performance: Stopping Heat and Condensation
- Mezzanine Floors & Steel Structures