Mezzanine Floors & Steel Structures
A steel mezzanine is a structural steel floor, platform or multi-level structure built inside a factory, warehouse, showroom or existing building to add usable floor area. Its design turns on the load case for its actual use under IS 875 Part 2, the capacity of the existing slab under its columns, and escape routes under NBC 2016 Part 4.
By Dhruv Agarwal · · 1 min read
What we deliver
Steel mezzanine floors, platforms, walkways, staircases and multi-level steel structures for factories, warehouses, showrooms and commercial buildings — designed, fabricated and erected, including in existing buildings.
A mezzanine is the fastest way to get more usable floor inside an existing building. It is also a structure that people and goods stand on, which makes the load case and the escape route the two things to get right before anything else.
Scope of works
| Stage | What we deliver |
|---|---|
| Assessment | Existing slab capacity, clear heights, access |
| Design | Beams, columns, bracing and decking to IS 800 |
| Load case | Office, storage or racking loads per IS 875 Pt 2 |
| Fabrication | Steel members, shop-primed |
| Erection | Columns, beams, decking, handrails |
| Access | Staircases, handrails, edge protection |
| Finishing | Deck surface, fire protection where required |
Where projects go wrong
- Designed for office load, used for storage. A common and dangerous mismatch.
- Existing slab not checked. Mezzanine columns bring concentrated loads down onto a floor that was not designed for them.
- Escape routes not considered. Added floor area needs exits.
- Clearances overlooked. Headroom under and over the mezzanine, and around services and sprinklers.
- No edge protection. Open edges need handrails and toe boards.
Why Hagerstone
Structural steel fabricated and erected in-house with 15 welders and 15 fitters, and the civil, MEP and fire teams to handle the slab checks, services and escape routes a mezzanine brings with it.
Work at height, lifting and equipment safety covered under our HSE system, with ISO 9001 / 14001 / 45001 and 79+ quality checkpoints.
Standards referenced
Steel design to IS 800:2007. Imposed loads to IS 875 (Part 2). Means of egress under NBC 2016, Part 4.
Standards referenced
- IS 800:2007 — General construction in steel — code of practice (Bureau of Indian Standards)
- IS 875 (Part 2) — Imposed loads (Bureau of Indian Standards)
- NBC 2016, Part 4 — Fire and life safety — means of egress (Bureau of Indian Standards)
Frequently asked
Related
More in PEB Structures
- PEB Roofing & Wall Cladding
- Crane Gantry and Material Handling: Designing the Frame Around the Lift
- PEB Erection and Site Works: Where Steel Programmes Slip
- PEB Insulation and Thermal Performance: Stopping Heat and Condensation