PEB Industrial Buildings & Warehouses

By Dhruv Agarwal · · 2 min read

What we deliver

Pre-engineered factories, warehouses, logistics sheds and industrial buildings — structure, cladding, civil foundations and flooring, and MEP delivered together rather than split between a steel supplier and several site contractors.

An industrial building is judged on a few things: clear span, clear height, floor capacity, and how soon it can start operating. PEB is chosen because it wins on all four — provided the foundations, the steel and the services are ready for each other.

Scope of works

StageWhat we deliver
DesignFrame, bracing and secondary members to IS 800 and IS 875
CivilFoundations, plinth, anchor bolts, grade slab
FabricationPrimary and secondary steel, shop-primed
ErectionFrames, bracing, purlins and girts
EnvelopeRoof and wall sheeting, insulated panels where specified
OpeningsRolling shutters, dock doors, ventilators, skylights
ServicesElectrical, lighting, firefighting and plumbing
HandoverInspection, documentation

What drives the cost

Clear span and eave height · crane capacity · roof and wall cladding specification · insulation · floor loading and slab thickness · number of dock openings · fire protection required for the stored goods · site access for steel delivery and cranes.

Where projects go wrong

  • Steel arrives before foundations are ready. Erection stalls and the steel sits in the open.
  • Grade slab designed without racking loads. High-bay racking concentrates large point loads on the floor.
  • Fire requirements set after the design. Sprinklers and hydrants change the roof height, water storage and pump room.
  • Ventilation and daylighting ignored. Large sheds without them are hot and dark and need lighting all day.
  • Drainage undersized. A large roof collects a great deal of water in a monsoon downpour.

Why Hagerstone

Single-partner execution — PEB, civil, MEP and interiors under one integrated team, so foundations, steel and services are sequenced by one programme.

15 welders, 15 fitters, a 35-member firefighting team and a 53-member site team in-house, under ISO 9001 / 14001 / 45001 and 79+ quality checkpoints.

Standards referenced

Steel design to IS 800:2007. Wind loading to IS 875 (Part 3). Fire and life safety for industrial and storage occupancy under NBC 2016, Part 4.

Standards referenced

  • IS 800:2007General construction in steel — code of practice
  • IS 875 (Part 3)Wind loads on buildings
  • NBC 2016, Part 4Fire and life safety — industrial and storage occupancy