Gypsum Board Types — Regular, Moisture and Fire
Gypsum board is a gypsum core faced with paper liner, made in regular, moisture resistant, fire resistant, impact resistant and acoustic grades that vary the core additives and liner. A partition's fire and acoustic rating belongs to the complete tested system, not to the board grade alone.
By Dhruv Agarwal · · 1 min read
What it is
A gypsum core faced with paper liner, produced in grades that vary the core additives and the liner to suit different duties.
The grades
| Grade | Identifying colour (typical) | Use |
|---|---|---|
| Regular | Ivory / grey liner | General partitions and ceilings |
| Moisture resistant | Green | Pantries, humid areas, wet-area backing |
| Fire resistant | Pink / red | Within tested fire-rated systems |
| Impact resistant | Varies | Corridors, schools, high-traffic areas |
| Acoustic / high density | Varies | Where partition sound rating matters |
Colours vary by manufacturer and should never be the basis of specification — the grade and standard reference should be.
The system, not the board
A partition's fire rating, acoustic rating and structural performance are properties of the complete tested assembly:
- Board type, thickness and number of layers
- Stud gauge, depth and centres
- Insulation type and density in the cavity
- Screw type, length and spacing pattern
- Joint staggering between layers
- Head, base and junction detailing
Substituting any one of these breaks the test. On a fire-rated wall that is not a paperwork issue — it is the wall not doing what the fire strategy assumes.
Where projects go wrong
- Fire board in an untested arrangement, assumed to give a rating.
- Moisture resistant board inside showers, where cement board is required.
- Screw spacing widened to save time, changing the tested system.
- Joints not staggered between layers in double-layer systems.
- Boards installed before the building is dry, so they absorb moisture and sag.
Standards referenced
Gypsum plaster boards under IS 2095 (Part 1) and EN 520. Fire and life safety provisions under NBC 2016, Part 4.
Standards referenced
- IS 2095 (Part 1) — Gypsum plaster boards (Bureau of Indian Standards)
- NBC 2016, Part 4 — Fire and life safety (Bureau of Indian Standards)
- EN 520 — Gypsum plasterboards — definitions and requirements (CEN-CENELEC)
Frequently asked
Related
More in Materials
- High Pressure Laminate (HPL) Cladding Panel
- Laminate and Veneer for Joinery and Wall Panelling
- Metal Ceiling Tiles — Perforation and Acoustics
- Natural Stone Cladding — Granite, Sandstone, Marble