Glass Wool Insulation for Ducts, Ceilings and Walls
Glass wool is mineral fibre spun from molten glass and bound into rolls, slabs and pipe sections, used for duct wrap, internal duct lining, ceiling plenum blankets and partition infill. It is lighter and cheaper than rock wool with slightly better thermal performance per millimetre, but lower temperature tolerance.
By Dhruv Agarwal · · 1 min read
What it is
Mineral fibre spun from molten glass, bound into rolls, slabs and pipe sections. Lighter and cheaper than rock wool, with slightly better thermal conductivity per millimetre and lower temperature tolerance.
Specification at a glance
| Property | Typical specification |
|---|---|
| Standard | IS 8183, bonded mineral wool |
| Thermal conductivity | Approximately 0.032 — 0.040 W/mK |
| Density range | 12 — 48 kg/m³ typical |
| Fire class | A1 / A2 to EN 13501-1 by product and facing |
| Facing | Plain, reinforced foil, tissue, or black glass tissue |
| Service temperature | Lower than rock wool |
Density by application
| Application | Density |
|---|---|
| Duct wrap, external | 16 — 24 kg/m³, foil faced |
| Duct lining, internal acoustic | 32 — 48 kg/m³, tissue faced |
| Ceiling plenum blanket | 12 — 16 kg/m³ |
| Partition acoustic infill | 24 — 48 kg/m³ |
| Pipe section | Preformed, density by diameter |
Where it belongs on a fit-out
Duct wrap on conditioned-air and chilled-water ducts, foil faced for vapour control. Internal duct lining where fan and airflow noise must be absorbed before it reaches the occupied space. Partition infill between meeting rooms and tenancies, where the acoustic rating of the partition depends on it. Above ceiling, as a plenum blanket where the slab soffit is uninsulated.
Where projects go wrong
- Unfaced insulation on a cold duct. Condensation forms inside the insulation, performance collapses, and ceilings stain below.
- Foil joints untaped. The vapour barrier is only continuous if the laps are sealed; an untaped lap is an open path.
- Insulation compressed by a cable tray or hanger. Compression reduces thickness and performance at exactly the points nobody inspects.
- Glass wool used as a cavity barrier. It is not the specified material for that duty; rock wool is.
Standards referenced
Bonded mineral wool under IS 8183. Reaction-to-fire classification to EN 13501-1. Services and envelope insulation requirements under ECBC 2017.
Standards referenced
- IS 8183 — Bonded mineral wool (Bureau of Indian Standards)
- EN 13501-1 — Reaction to fire classification (CEN-CENELEC)
- ECBC 2017 — Building envelope and services insulation (Bureau of Energy Efficiency)
Frequently asked
Related
More in Materials
- Gypsum Board Types — Regular, Moisture and Fire
- High Pressure Laminate (HPL) Cladding Panel
- Laminate and Veneer for Joinery and Wall Panelling
- Metal Ceiling Tiles — Perforation and Acoustics