Rock Wool Insulation — Density, Fire and Acoustics

Rock wool is mineral fibre spun from molten rock and bound into slabs, rolls or loose fill; it insulates thermally, absorbs sound and is classified A1 non-combustible under EN 13501-1. Its density has to be specified for each application, and its non-combustibility is why it is used for cavity barriers and ventilated facade cavities.

By Dhruv Agarwal · · 2 min read

What it is

Mineral fibre spun from molten rock, bound into slabs, rolls or loose fill. It insulates thermally, absorbs sound, and does not burn.

That last property is why it appears in positions where nothing else is acceptable.

Specification at a glance

PropertyTypical specification
StandardIS 8183, bonded mineral wool
Thermal conductivityApproximately 0.035 — 0.040 W/mK
Fire classA1, non-combustible, to EN 13501-1
Melting pointAbove 1,000°C
Density range48 — 150 kg/m³ by application
FacingPlain, tissue faced, or foil faced

Density by application

ApplicationDensity
General thermal infill48 — 64 kg/m³
Ventilated facade slab80 — 100 kg/m³
Cavity barriers100 — 150 kg/m³
Acoustic partition infill48 — 80 kg/m³
Roof deck board140 — 160 kg/m³

Where it is the only correct answer

  • Cavity barriers at every compartment line in a ventilated facade
  • Insulation in a ventilated cavity on high-rise and high-occupancy buildings
  • Fire-rated partitions and shafts, where the tested system names it
  • Acoustic separation between tenancies and around plant rooms
  • High-temperature plant insulation, where organic foams cannot go

Thermal trade-off, stated honestly

Rock wool insulates less well per millimetre than PIR — roughly 0.037 against 0.022 W/mK — so reaching the same U-value needs a thicker build-up. On envelopes where depth is constrained, that is a real cost. Many industrial projects therefore run PIR across general areas and rock wool at fire-critical lines, which is a legitimate and common specification.

Where projects go wrong

  • Density unspecified. The single most common error.
  • Facade slabs too soft, so they slump in the cavity over time and leave gaps at the top of each storey.
  • Cavity barriers substituted for a cheaper general-purpose slab.
  • Left exposed to monsoon rain before the outer skin is fixed.
  • Compressed to fit. Compressing the slab reduces its thermal performance.

Standards referenced

Bonded mineral wool requirements under IS 8183. Reaction-to-fire classification to EN 13501-1. Opaque assembly U-value under ECBC 2017.

Standards referenced

  • EN 13501-1 — Reaction to fire classification (CEN-CENELEC)
  • IS 8183 — Bonded mineral wool (Bureau of Indian Standards)
  • ECBC 2017 — Building envelope — opaque assembly U-value (Bureau of Energy Efficiency)

Frequently asked

It depends entirely on the application. Roughly 48 to 64 kg/m³ suits general thermal infill, 80 to 100 kg/m³ suits ventilated facade slabs where the board must hold its shape and resist wind scour in the cavity, and 100 to 150 kg/m³ suits cavity barriers and acoustic partitions. A specification that names rock wool without a density is unenforceable, because performance changes completely across that range.

Because it is mineral and non-combustible, classified A1 under EN 13501-1. In a ventilated cavity the insulation sits in the air path, so a combustible insulation behind a combustible panel creates the exact assembly behind catastrophic facade fires. Cavity barriers at compartment lines are rock wool for the same reason: they must survive the fire they are stopping.

Yes, while it is wet. Water displaces the trapped air that does the insulating, so a saturated slab performs poorly until it dries. It does not rot or lose structure, and it dries out, which is why it is tolerated in ventilated cavities where a drained path exists. It should never be installed wet or left exposed to rain before the outer skin goes on.

Related

More in Materials

All Materials →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback