Acoustic Panel Calculator: Panels for a Target Reverberation Time

Sabine's formula estimates a room's reverberation time as RT = 0.161 V / A, where V is the room volume in m³ and A is the total sound absorption in m² sabins (each surface area times its absorption coefficient). Adding acoustic panels raises A and shortens RT, so the panels needed follow from the absorption a target RT requires.

By Dhruv Agarwal · · 4 min read

Acoustic panel calculator

m
m
m

Floor to ceiling, or to the soffit if there is no ceiling.

s

Take this from the project's acoustic brief. The default is only an example.

m
m

From the panel data sheet, as mounted. Between 0 and 1.

Assumptions (edit to match your project)

Averaged over floor, walls and ceiling, furniture included. Between 0 and 1.

Room volume

72 m³

108 m² of room surface

Current RT (estimate)

1.07 s

10.8 m² sabins of existing absorption

Panels needed

17

12.24 m² of panel, 8.5 m² sabins extra needed

RT with panels (estimate)

0.6 s

Target 0.6 s from the acoustic brief

Absorption balance
Room volume72 m³
Room surface area108 m²
Existing absorption10.8 m² sabins
Absorption needed for the target19.32 m² sabins
Extra absorption needed8.52 m² sabins
Absorption added by one panel0.504 m² sabins
Panels, 1.2 × 0.6 m17 nos (12.24 m²)
Absorption with panels19.37 m² sabins

How this was calculated

  • V = 6 × 4 × 3 = 72 m³; S = 2 × (24 + 18 + 12) = 108 m²
  • A now = 108 × 0.1 = 10.8 m²; RT = 0.161 × 72 / 10.8 = 1.07 s
  • A needed = 0.161 × 72 / 0.6 = 19.32 m²; extra = 19.32 − 10.8 = 8.52 m²
  • Per panel = (0.8 − 0.1) × 0.72 = 0.504 m²; panels = ceil(8.52 / 0.504) = 17
  • RT with panels = 0.161 × 72 / (10.8 + 17 × 0.504) = 0.6 s
  • Sabine assumes a diffuse sound field and a single average frequency. The target comes from the acoustic brief.

Send this result on WhatsApp

Your figures go with the message, so our team can reply on them directly.

Send on WhatsApp

Get a detailed quote

Indicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.

What it calculates

For a rectangular room, the calculator uses Sabine's formula to give:

  • the room volume and surface area;
  • the current reverberation time, estimated from an average absorption coefficient for the existing surfaces;
  • the absorption needed to reach the target reverberation time, and the extra absorption beyond what the room already has;
  • the number of acoustic panels of the size and coefficient entered;
  • the reverberation time achieved with that many panels.

Reverberation time is the time for sound in a room to decay by 60 dB after the source stops, the quantity measured in finished rooms under ISO 3382-2.

Inputs

Room length, width and height are in metres. Height is to the ceiling, or to the soffit if there is no ceiling.

Target reverberation time is in seconds. It is your design input, taken from the project's acoustic brief. The calculator does not choose a target, and the 0.6 s it starts with is only the value used in the worked example.

Panel width and height are in metres.

Panel absorption coefficient or NRC comes from the panel data sheet, for the panel as it will be mounted. Absorption coefficients are measured under ISO 354 or ASTM C423; NRC, defined in ASTM C423, is the average of the coefficients at 250, 500, 1000 and 2000 Hz, rounded to the nearest 0.05.

The assumptions panel holds the average absorption coefficient of the existing room surfaces.

Method

  1. Volume V = length × width × height; surface area S = 2 × (L × W + L × H + W × H).
  2. Existing absorption A = S × average coefficient of the existing surfaces.
  3. Current RT = 0.161 × V ÷ A (Sabine, metric units).
  4. Absorption needed = 0.161 × V ÷ target RT; extra absorption = needed − existing, or zero if the room already meets the target.
  5. Each panel covers a surface, so it adds (panel coefficient − room coefficient) × panel area.
  6. Panels = extra absorption ÷ absorption per panel, rounded up.
  7. RT with panels = 0.161 × V ÷ (existing absorption + panels × absorption per panel).

Assumptions

AssumptionDefaultNotes
Average coefficient of existing surfaces0.1Hard walls, hard floor and glass sit low; carpet, an absorbent ceiling and soft furniture raise it
Sabine constant0.161 s/mMetric form of the formula
Coefficient limit1.0Laboratory coefficients can exceed 1 at some frequencies; the calculator caps entries at 1

The defaults for the inputs are a 6 × 4 × 3 m room, a target of 0.6 s, and 1.2 × 0.6 m panels with a coefficient of 0.8. They are example values, not recommendations.

Limitations

  • Sabine assumes a diffuse sound field. It treats sound as spread evenly through the room. Long, narrow, very low or very irregular rooms, and rooms with all the absorption on one surface, do not behave that way.
  • It averages across frequency. One coefficient stands for all frequencies. Real reverberation time differs from band to band, and thin panels absorb little at low frequencies; check the data sheet band by band where low frequencies matter.
  • It overstates RT in very absorbent rooms. Where the average coefficient is high, Sabine gives a longer reverberation time than the room will have, so the panel count is on the high side. The calculator warns above an average of 0.3.
  • Position is not considered. Panels on parallel walls that face each other, or on the ceiling, behave differently from panels bunched in one place. Placement is part of the acoustic design.
  • Air absorption, people and furniture are not modelled separately; fold them into the average coefficient if you include them.
  • It says nothing about sound insulation. Panels inside a room do not stop sound passing to the next room; that depends on the partition, the ceiling void and flanking paths.

Worked example

A meeting room 6 × 4 × 3 m with an average existing coefficient of 0.1, a target of 0.6 s from the acoustic brief, and 1.2 × 0.6 m panels with a coefficient of 0.8:

StepCalculationResult
Volume6 × 4 × 372 m³
Surface area2 × (24 + 18 + 12)108 m²
Existing absorption108 × 0.110.8 m² sabins
Current RT0.161 × 72 / 10.81.07 s
Absorption needed0.161 × 72 / 0.619.32 m² sabins
Extra absorption19.32 − 10.88.52 m² sabins
Absorption per panel(0.8 − 0.1) × 0.720.504 m² sabins
Panels8.52 / 0.504, rounded up17 (12.24 m² of panel)
RT with panels0.161 × 72 / (10.8 + 17 × 0.504)0.6 s

The room needs 17 panels, 12.24 m² in all, which brings the estimated reverberation time from 1.07 s to 0.6 s.

How engineers use it

At design stage, an acoustic consultant or designer sets a reverberation time target for each room type in the acoustic brief, then calculates RT from the volume and the absorption of every proposed finish, using data sheet coefficients band by band. Panels, ceiling and floor finishes are adjusted until each band meets the target. A single-number Sabine check like this one is used earlier, to see whether a room is likely to need treatment and roughly how much panel area to allow on the layout.

When a professional design must replace it

Use the calculator to get a first view of how much absorption a room needs, or to check a panel quantity you have been given. Replace it with an acoustic design by a consultant wherever speech intelligibility or privacy matters, such as boardrooms, video conference rooms, training rooms and auditoria, wherever the room is large or irregular, and wherever the target has to be verified by measurement under ISO 3382-2 after completion.

Standards referenced

  • ISO 3382-2 — Acoustics — measurement of room acoustic parameters, reverberation time in ordinary rooms (ISO)
  • ISO 354 — Acoustics — measurement of sound absorption in a reverberation room (ISO)
  • ASTM C423 — Sound absorption and sound absorption coefficients by the reverberation room method (ASTM International)

Frequently asked

Work out the absorption the target reverberation time needs with Sabine's formula, A = 0.161 V / RT, and subtract the absorption the room already has. Divide the shortfall by the absorption one panel adds, which is its area times the difference between its coefficient and that of the surface it covers, and round up.

The target comes from the project's acoustic brief, set for the room's use by the designer or acoustic consultant. This calculator does not choose it. The 0.6 s it starts with is only an example value for the worked example, not a recommendation for any room.

Sabine's formula, RT = 0.161 V / A in metric units, estimates the time for sound in a room to decay by 60 dB after the source stops. V is the room volume in cubic metres and A is the total absorption in square metre sabins, the sum of each surface's area times its absorption coefficient.

Either, from the panel data sheet, as long as you know what it represents. NRC is a single average over the speech frequencies; an absorption coefficient at one frequency band lets you check that band. Use the value for the panel as it will be mounted, because the air gap behind a panel changes its absorption.

It is a design-stage estimate. Sabine assumes sound is spread evenly through the room and the calculation uses one average coefficient across frequency. It tends to overstate reverberation time in rooms with a lot of absorption, and it cannot account for where panels are placed. The finished room can be measured under ISO 3382-2.

Related

More in Calculators

All Calculators →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback