NRC Rating: How Much Sound a Surface Absorbs

NRC — Noise Reduction Coefficient — is a single number between 0 and 1 describing how much sound a surface absorbs rather than reflects. An NRC of 0.70 means the material absorbs roughly 70% of the sound striking it, averaged across the speech-frequency range.

By Dhruv Agarwal · · 1 min read

Why it matters

Open-plan offices fail most often on noise, and the fix is largely absorption: ceilings, carpet and wall panels that stop voices reflecting across the floor. NRC is the number that tells you how much a material will help.

How it works in practice

NRCBehaviourExample
0.0 – 0.2ReflectivePlasterboard, glass, stone
0.4 – 0.6Moderate absorptionStandard ceiling tiles
0.7 – 0.9High absorptionAcoustic tiles, baffles, fabric panels

Common mistakes

  • Confusing absorption with insulation. High NRC does not stop sound passing through a wall.
  • Hard finishes everywhere. Glass, stone and plasterboard together make a loud office.
  • Ignoring the ceiling. It is usually the most effective place to absorb.

Standards referenced

Sound absorption is measured in a reverberation room under ISO 354.

Standards referenced

  • ISO 354 — Measurement of sound absorption in a reverberation room (ISO)

Frequently asked

Open-plan offices benefit from ceilings around NRC 0.70 or above, because the ceiling is the largest continuous surface and controls how much speech bounces around the floor. Lower-NRC ceilings make open plans noticeably louder.

No. NRC measures absorption inside a room, not blocking between rooms. Privacy between rooms depends on sound insulation — walls to slab, sealed plenums and good glazing — which is a different property entirely.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback