Purlins and Girts: The Secondary Steel of a PEB

Purlins are the horizontal members spanning between roof frames that carry the roof sheeting; girts are their equivalent on the walls, carrying wall cladding. Together they are the secondary framing that transfers cladding loads into the main frames.

By Dhruv Agarwal · · 1 min read

Why it matters

Roof and wall cladding is only as secure as the steel it is fixed to. Purlins and girts carry wind suction, maintenance loads and the weight of the cladding into the frames, and in storms they are often where failures begin.

How it works in practice

MemberLocationTypical section
PurlinRoof, between framesCold-formed Z or C
GirtWall, between columnsCold-formed Z or C
Eave strutRoof-to-wall edgeCold-formed C
Sag rodBetween purlinsRestrains them sideways

Common mistakes

  • Uniform spacing across the roof. Edge and corner zones see higher uplift.
  • Omitting sag rods or bracing. Thin sections twist without restraint.
  • Hanging loads without checking. Services, cable trays and solar panels add load purlins were not designed for.

Standards referenced

Cold-formed members under IS 801. Wind loads under IS 875 (Part 3).

Standards referenced

  • IS 801 — Use of cold-formed light gauge steel structural members (Bureau of Indian Standards)
  • IS 875 (Part 3) — Wind loads on buildings (Bureau of Indian Standards)

Frequently asked

They are cold-formed from thin galvanised strip, which makes them light and economical. Z sections can be lapped over supports to act continuously and nest for transport; C sections are common for simple spans, eave struts and trimming around openings.

The roof loads — including wind suction and any roof-mounted equipment — and the span capability of the chosen roof sheet. Wind uplift is often the governing case, particularly at roof edges and corners.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback