VAV System: Variable Air Volume Cooling

A VAV — variable air volume — system cools different zones by varying how much conditioned air each receives, through motorised VAV boxes in the ductwork controlled by zone thermostats. Rooms that need less cooling get less air, rather than everything getting the same airflow.

By Dhruv Agarwal · · 1 min read

Why it matters

Comfort complaints in new offices are very often VAV complaints. The system is good at zoned control, but only if its zones match the layout — which they rarely do after a fit-out unless someone re-balances them.

How it works in practice

ComponentRole
AHUSupplies conditioned air
VAV boxVaries airflow to one zone
Zone thermostatTells the box how much air is needed
BMSCoordinates boxes and the AHU

Common mistakes

  • Not re-balancing after a fit-out. The most common cause of hot and cold rooms.
  • One box serving rooms with different loads. Neither room is comfortable.
  • Blocking the return path. Walls to slab can starve the system of return air.

Standards referenced

HVAC energy requirements under ECBC 2017.

Standards referenced

  • ECBC 2017 — HVAC system requirements (Bureau of Energy Efficiency)

Frequently asked

Because different parts of a floor need different amounts of cooling — a sunny perimeter, a full meeting room and an empty corner are not the same. VAV lets each zone be controlled separately and saves energy compared with constant-volume systems.

Zones change. A VAV box that served one open area may now serve two rooms with different loads, making one too cold and the other stuffy. Re-zoning and re-balancing are a normal and necessary part of a fit-out.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback