Tapered Frame: Why PEB Members Change Depth

A tapered frame is the primary portal frame of a pre-engineered building, built from welded plate sections whose depth varies along their length — deep where bending moment is highest, such as at the knee and ridge, and shallow where it is low — so steel is placed only where the load needs it.

By Dhruv Agarwal · · 1 min read

Why it matters

The frame is most of a PEB's steel tonnage, and tonnage drives cost. Tapering is what makes PEB economical: by varying the web depth along each member, the designer removes steel that a uniform section would carry for no structural reason.

How it works in practice

FeatureWhat it means
Built-up sectionFlanges and web cut from plate and welded
Variable depthDeeper at the knee and ridge, shallower at mid-rafter
Bolted connectionsFrames bolted together on site
Design basisMember forces from the building's actual loads

Common mistakes

  • Comparing PEB and conventional steel on rate per tonne. PEB often uses less steel, so tonnage comparisons mislead.
  • Adding crane or roof loads after design. Tapered members are optimised for the original loads and cannot absorb large additions.
  • Ignoring connection quality. Bolted knees and splices must be tightened and inspected properly.

Standards referenced

Steel design under IS 800:2007.

Standards referenced

  • IS 800:2007 — General construction in steel — code of practice (Bureau of Indian Standards)

Frequently asked

A rolled section has the same depth along its whole length, so it has to be sized for the worst point and carries surplus steel everywhere else. A tapered built-up member follows the bending moment, which usually makes the frame lighter and cheaper for the same span — the main reason PEB dominates large-span industrial buildings.

They are ideal for single-storey, large-span buildings such as warehouses and factories. Multi-storey buildings with heavy floor loads, complex geometry or many openings often suit conventional steel or RCC better.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback