Tile Adhesive and Grout Calculator: Bags and Kilograms

Tile adhesive is estimated from the consumption on its data sheet, in kg per square metre for the trowel notch used, times the tiled area. Grout is estimated from the volume of the joints: joint length per square metre, from the tile size, times joint width and depth, times the grout's density. Both get a wastage allowance.

By Dhruv Agarwal · · 4 min read

Tile adhesive and grout calculator

sq ft

= 46.45 m². Floor or wall area to be tiled, less openings.

mm
mm
mm

The spacer or joint width in the tiling specification.

mm

Taken as the depth of the grout joint.

Assumptions (edit to match your project)
kg/m²

From the adhesive data sheet, for the trowel notch you will use. Larger tiles and uneven surfaces need a bigger notch and more adhesive.

kg
kg/dm³ (kg/L)

From the grout data sheet.

%

Mixed material left in the bucket, spillage and cleaning off.

Tile adhesive bags

13

255.5 kg in 20 kg bags

Grout

7.4 kg

0.144 kg/m² before wastage

Tiled area

46.45 m²

500 sq ft

Quantities
Tiled area46.45 m²
Adhesive at 5 kg/m² + 10%255.5 kg
Adhesive bags of 20 kg13 nos
Grout per m² of tiling0.144 kg
Grout + 10%7.4 kg

How this was calculated

  • Area = 500 sq ft × 0.092903 = 46.45 m²
  • Adhesive = 46.45 × 5 × 1.1 = 255.5 kg; bags = ceil(255.5 / 20) = 13
  • Grout kg/m² = (L + W) / (L × W) × joint width × joint depth × density
  • = (600 + 600) / (600 × 600) × 3 × 9 × 1.6 = 0.144 kg/m²
  • Grout = 46.45 × 0.144 × 1.1 = 7.4 kg
  • L, W, joint width and depth in mm; density in kg/dm³.

Send this result on WhatsApp

Your figures go with the message, so our team can reply on them directly.

Send on WhatsApp

Get a detailed quote

Indicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.

What it calculates

For a tiled floor or wall, the calculator gives:

  • the tiled area in square feet and square metres;
  • the tile adhesive in kilograms and whole bags;
  • the grout in kilograms, and the grout consumption in kg per square metre.

To count the tiles themselves, use the flooring quantity calculator.

Inputs

Tiled area is in square feet, less any openings; the square metre figure is shown under the field.

Tile length and tile width are in millimetres.

Joint width is the spacer or joint width in the tiling specification, in millimetres.

Tile thickness is in millimetres and is used as the depth of the grout joint.

The assumptions panel holds the adhesive consumption, the adhesive bag size, the grout density and the wastage allowance.

Method

  1. Area in m² = area in sq ft × 0.092903.
  2. Adhesive = area in m² × consumption in kg/m² × (1 + wastage).
  3. Adhesive bags = adhesive ÷ bag size, rounded up.
  4. Grout in kg/m² = (L + W) / (L × W) × joint width × joint depth × density.
  5. Grout = area in m² × grout in kg/m² × (1 + wastage).

In step 4, L, W, the joint width and the joint depth are in millimetres and the density is in kg/dm³ (the same as kg per litre). (L + W) / (L × W) is the length of joint in each unit of tiled area. Multiplied by the joint's width and depth it gives the depth of grout spread over the area in millimetres, and 1 mm over 1 m² is 1 dm³, so multiplying by the density gives kg per square metre.

Assumptions

AssumptionDefaultNotes
Adhesive consumption5 kg/m²Illustrative starting value: replace with the figure on your product's data sheet for your trowel notch
Adhesive bag size20 kgCheck the bag size of the product you are buying
Grout density1.6 kg/dm³Illustrative starting value: replace with the figure on your product's data sheet
Wastage10%Material left in the bucket, spillage and cleaning off

The adhesive consumption is the input that matters most. It can vary several-fold between a small notch on a flat wall and a large notch on a floor laid with large-format tiles.

Limitations

  • One tile size and joint width at a time. Run each tile type separately.
  • Joint depth is taken as the tile thickness. Where the joint is shallower, enter the actual depth.
  • The adhesive figure is only as good as the data sheet value. A surface out of level, or back-buttering of large tiles, raises consumption above the data-sheet figure.
  • Movement joints are not deducted. Perimeter and field movement joints are filled with sealant, not grout, as the tiling specification sets out.
  • It does not choose the adhesive or the grout. The adhesive class, and a cement or reaction resin (epoxy) grout, are a specification decision for the tile, background and use.

Worked example

500 sq ft of 600 × 600 mm tiles, 9 mm thick, with 3 mm joints, adhesive at 5 kg/m² in 20 kg bags, grout at 1.6 kg/dm³ and 10% wastage:

StepCalculationResult
Area500 × 0.09290346.45 m²
Adhesive46.45 × 5 × 1.10255.5 kg
Adhesive bags255.5 / 20, rounded up13
Grout per m²(600 + 600) / (600 × 600) × 3 × 9 × 1.60.144 kg/m²
Grout46.45 × 0.144 × 1.107.4 kg

The floor needs 13 bags of adhesive and about 7.4 kg of grout. With 300 × 300 mm tiles of the same thickness and joint, the grout doubles to 0.288 kg/m², or about 14.7 kg.

How engineers use it

On a fit-out, tiling is measured from the drawings in square metres for each tile type, and the specification names the adhesive class, the trowel notch, the joint width, the grout type and the movement joints. Adhesive and grout quantities then follow from the manufacturers' data sheets for those products. A calculation like this one is the quick check that a supplier's or tiler's material estimate is in the right range.

When a professional design must replace it

Use the calculator to estimate how much adhesive and grout to buy, or to check an estimate. Replace it with a measured take-off and a written tiling specification for a whole building, for wet areas, external or facade tiling, heavy or large-format tiles, and chemical or hygiene areas. The tiling specification and the products' data sheets, not a rule of thumb, decide what is used.

Standards referenced

  • IS 15477 — Adhesives for use with ceramic, glass and stone tiles — specification (Bureau of Indian Standards)
  • EN 12004-1 — Adhesives for ceramic tiles — requirements, classification and marking (CEN-CENELEC)
  • EN 13888-1 — Grouts for ceramic tiles — requirements, classification, designation, marking and labelling (CEN-CENELEC)

Frequently asked

Multiply the tiled area in square metres by the adhesive consumption on the data sheet, in kg per square metre for your trowel notch, add a wastage allowance and divide by the bag size, rounding up. 500 sq ft (46.45 m²) at 5 kg per square metre with 10% wastage is 255.5 kg, or 13 bags of 20 kg.

Grout in kg per square metre = (L + W) / (L × W) × joint width × joint depth × density, with tile length L, tile width W, joint width and depth in mm and density in kg/dm³. For 600 × 600 mm tiles with 3 mm joints 9 mm deep and grout at 1.6 kg/dm³, that is 0.144 kg per square metre before wastage.

It depends mainly on the trowel notch, which is chosen for the tile size and the flatness of the surface. Larger tiles, uneven backgrounds and back-buttering the tile all need more adhesive. The data sheet gives the consumption for each notch size, so take the figure for the notch you will actually use.

Smaller tiles mean more joints in every square metre. Halving the tile size in both directions doubles the joint length per square metre, and so doubles the grout for the same joint width and depth. That is why mosaics use far more grout than large-format tiles.

It is the usual assumption and a slightly generous one, since part of the joint below the tile edge is taken up by adhesive. Where the specification sets a shallower grout depth, for example a joint raked out for a sealant, enter that depth instead.

Related

More in Calculators

All Calculators →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback