Paint Calculator: How Many Litres of Paint for a Room

A paint quantity calculation works out the area to be painted, the walls less doors and windows plus the ceiling if included, multiplies it by the number of coats, and divides by the paint's coverage for each litre. A small allowance covers touch-ups and wastage.

By Dhruv Agarwal · · 3 min read

Paint quantity calculator

ft
ft
ft

Floor to false ceiling, or to the slab if there is none.

doors
windows
coats
sq ft a litre, a coat

From the product datasheet, for your surface.

Assumptions (edit to match your project)
coats

0 if the walls are already primed.

sq ft a litre, a coat
ft
ft
ft
ft
%

Finish paint

11.9 L

2 coats

Primer

7.1 L

1 coat

Surface to paint

647 sq ft

60.1 m²

Openings left out

53 sq ft

Areas (sq ft)
Walls, gross: 2 × (20 + 15) × 10700
Less doors and windows−53
Walls to paint647
Ceiling0
Surface to paint647

How this was calculated

  • Paint = 647 × 2 coats / 120 × (1 + 10%) = 11.86 L
  • Primer = 647 × 1 coat / 100 × (1 + 10%) = 7.12 L
  • Putty, if the walls need it, is estimated separately from its own datasheet.

Send this result on WhatsApp

Your figures go with the message, so our team can reply on them directly.

Send on WhatsApp

Get a detailed quote

Indicative figures for early planning, based only on the inputs and assumptions above. This is not a design, a quotation or a compliance check. A qualified engineer or consultant must confirm any figure before it is used to order, build or sign.

What it calculates

The calculator gives the quantity of finish paint and primer for a room, in litres, along with:

  • the surface to paint, walls less doors and windows, plus the ceiling if chosen;
  • the area of openings left out;
  • a breakdown of how the surface area was built up.

Inputs

Room length, width and wall height are the inside dimensions in feet. Use the height to the false ceiling where there is one, since the wall above it is not painted.

Paint chooses walls only, or walls and ceiling.

Doors and windows are counts; their sizes are in the assumptions panel.

Finish coats and finish paint coverage come from the paint specification and the product datasheet.

The assumptions panel holds primer coats and coverage, the door and window sizes, and a touch-up and wastage allowance.

Method

  1. Gross wall area = 2 × (length + width) × height.
  2. Openings = doors × door width × door height + windows × window width × window height.
  3. Surface to paint = gross wall area − openings, plus length × width if the ceiling is included.
  4. Finish paint = surface × coats ÷ coverage × (1 + allowance).
  5. Primer = surface × primer coats ÷ primer coverage × (1 + allowance).

Assumptions

AssumptionDefaultNotes
Finish coats2Over one coat of primer
Finish paint coverage120 sq ft a litre for each coatReplace with the datasheet figure
Primer coats10 if the wall is already primed
Primer coverage100 sq ft a litre for each coatReplace with the datasheet figure
Door3 × 7 ftChange for wider or double doors
Window4 × 4 ftChange to your window sizes
Touch-up and wastage10%Rollers, trays, cutting-in and touch-ups

Coverage is the input that matters most. Datasheets give it for a smooth surface under good conditions; site coverage on new or textured walls is usually lower.

Limitations

  • Rectangular rooms only. Add walls of other shapes separately.
  • Openings are averaged. Rooms with full-height glazing or many doors should use their real opening sizes.
  • No putty, texture or special finishes. Those have their own coverage and process.
  • Paint is sold in fixed pack sizes. Round the litres up to the packs available, and buy the whole quantity from one batch so the shade matches.
  • It does not choose the paint. Washable, low-VOC, anti-bacterial and other finishes are a specification decision for the space.

Worked example

A 20 ft × 15 ft room with 10 ft walls, one door and two windows, walls only, two finish coats at 120 sq ft a litre and one primer coat at 100 sq ft a litre:

StepCalculationResult
Gross wall area2 × (20 + 15) × 10700 sq ft
Openings1 × 3 × 7 + 2 × 4 × 453 sq ft
Surface to paint700 − 53647 sq ft (60.1 m²)
Finish paint647 × 2 / 120 × 1.1011.9 L
Primer647 × 1 / 100 × 1.107.1 L

The room needs about 12 litres of finish paint and 7 litres of primer. Painting the ceiling as well adds 300 sq ft, taking the totals to about 17.4 litres of paint and 10.4 litres of primer.

How engineers use it

On a fit-out, painting quantities are measured from the drawings in square metres for each finish and each surface type, and the specification sets the full system: surface preparation, putty, primer and the number of finish coats. The quantity of material then follows from the manufacturer's coverage for that system. A calculation like this one is the quick check that a supplier's or painter's material estimate is in the right range.

When a professional design must replace it

Use the calculator to estimate how much paint to buy for a room or to check an estimate. Replace it with a measured take-off and a written paint specification for a whole office or building, where surfaces, finishes and colours vary from room to room and where the preparation work is a large part of the job.

Standards referenced

  • IS 15489 — Paint, plastic emulsion: specification (Bureau of Indian Standards)

Frequently asked

Two finish coats over a primer is the usual specification for interior emulsion on new or repaired walls. A strong colour change, a dark colour or a porous surface may need a third. The paint manufacturer's system specification for the product is the reference.

Use the figure on the product's datasheet, for one coat on your kind of surface. Coverage falls on rough, porous or textured walls and rises on smooth, sealed ones, so the same paint can cover noticeably less on new plaster than on a previously painted wall. The calculator starts at 120 sq ft a litre for each coat; change it to the datasheet figure.

New plaster, putty, repaired patches and walls changing from a dark to a light colour normally need a primer coat so the finish coats cover evenly and adhere properly. A sound, previously painted wall in a similar colour may not. Set primer coats to zero if none is needed.

No. Wall putty is applied before primer to level the surface, and its quantity depends on how uneven the wall is and how many coats are needed. Estimate it from the putty manufacturer's coverage figures.

Only if it is being painted in the same exercise. Ceilings often use a different paint and colour, and in offices are often a false ceiling with its own finish. Choose walls and ceiling only when the same product goes on both.