Residential Developments — Doors, Windows, Facade and Railings

For residential towers, envelope work means aluminium doors and windows, railings and facades repeated across hundreds of units. Because the same element repeats floor after floor, fabrication accuracy, water tightness at height and installation pace decide the quality buyers see.

By Dhruv Agarwal · · 1 min read

What residential developers need

Residential towers are defined by repetition. The same window, door and railing repeat across hundreds of units and dozens of floors, so fabrication accuracy, water tightness at height and installation pace set the quality buyers see — and the snag list the developer has to close before handover.

What we deliver for residential

ScopeWhat it covers
Aluminium doors & windowsImported and system fenestration
RailingsSS, aluminium and glass balustrades
Curtain wallPodium and amenity glazing
CladdingTower and podium cladding

Delivered work

ProjectScopeQuantity
M3M, Sector 79Aluminium & glass doors and windows28,000 sq. ft.

Facade leadership experience

Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering), has led delivery on projects including:

ProjectScopeQuantity
Krisumi Waterfall Residences, Sector 36AImported aluminium doors & windows + SS railing13,871 sq. m. + 7,107 r. m.
Adani Samsara Vilasa, Sector 60Imported aluminium doors & windows6,398 sq. m.

Why Hagerstone for residential

In-house fabrication — approximately 9,000 sq. ft. with 10,000+ sqm per month capacity — and a system partner, Winda Window Systems, for engineered aluminium and uPVC fenestration.

Standards referenced

Wind loading on high-rise fenestration to IS 875 (Part 3). Safety glass to IS 2553 (Part 1).

Standards referenced

Frequently asked

Consistency across hundreds of identical openings, weather tightness on high floors, and a programme that keeps pace with the structure. Fenestration on a residential tower is highly repetitive, so fabrication quality and installation discipline decide whether every unit performs the same.

Aluminium and glass door and window work for M3M in Sector 79, Gurugram. Our Director – Facade, Akhilesh Kumar Singh, has also led imported aluminium doors and windows and SS railing at Krisumi Waterfall Residences, Sector 36A Gurgaon, and imported aluminium doors and windows at Adani Samsara Vilasa, Sector 60 Gurgaon.

Related

More in Industries

All Industries →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback