Railings — Aluminium, Stainless, MS and Glass
Railings are protective barriers in aluminium, stainless steel, mild steel or glass, designed to the imposed handrail load for the building's occupancy under IS 875 (Part 2), which sets the base fixing, post spacing and glass thickness. Glass balustrades use laminated glass so the barrier stays in place if a pane fails.
By Dhruv Agarwal · · 2 min read
What we deliver
Aluminium, stainless steel, mild steel and glass railing systems — balustrades, balcony railings, terrace and staircase railings, engineered to the imposed loading for the occupancy rather than assembled to a standard detail.
A railing is a protective barrier before it is a design element. It is one of the few facade components where a specification error puts a person at direct risk, which is why the load case and the base fixing get designed rather than assumed.
Facade leadership experience
Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering), has led delivery on projects including:
| Project | Location | Scope | Quantity |
|---|---|---|---|
| Krisumi Waterfall Residences | Sector 36A, Gurgaon | SS railing with imported aluminium doors & windows | 7,107 r. m. + 13,871 sq. m. |
Scope of works
| Stage | What we deliver |
|---|---|
| Load assessment | Imposed handrail load per occupancy, IS 875 Pt 2 |
| Design | Post spacing, base fixing, glass thickness, connection detail |
| Material selection | SS grade, aluminium alloy and finish, glass build-up |
| Fabrication | In-house cutting, welding, finishing |
| Installation | Setting out, anchor fixing, glass setting, levelling |
| Handover | Load verification of fixings, finish inspection, snagging |
What drives the cost
Running length · material — SS, aluminium, MS or frameless glass · stainless grade (304 versus 316 for coastal or external exposure) · glass build-up and thickness · whether posts are surface-mounted or core-drilled · handrail profile and joint detailing · site access.
Where projects go wrong
- Single toughened glass in a barrier. If it fails, the barrier is gone. Laminated construction keeps the panel in place.
- Base fixings not designed for the load. The anchor into the slab is the weakest point in most failed railings, and it is invisible once finished.
- 304 stainless in coastal or heavily polluted exposure. It pits and tea-stains; 316 is the grade for those environments.
- Post spacing set by appearance. Spacing follows from the design load and the glass or infill span, not from what looks balanced on an elevation.
- MS railing with an inadequate coating system. Economical on day one, rusting within a couple of monsoons.
Why Hagerstone
In-house fabrication and welding — a dedicated welding team within a facade organisation that also delivers glazing, cladding and fenestration, so railing interfaces with the facade are one party's responsibility.
100% in-house execution, ISO 9001 / 14001 / 45001 certified, 79+ quality checkpoints, with work-at-height and lifting safety covered under our HSE system.
Standards referenced
Protective barrier requirements under NBC 2016, Part 4. Imposed handrail loading from IS 875 (Part 2). Architectural safety glass, including laminated construction for barriers, under IS 2553 (Part 1).
Standards referenced
- NBC 2016, Part 4 — Fire and life safety — protective barriers (Bureau of Indian Standards)
- IS 875 (Part 2) — Imposed loads — handrail loading (Bureau of Indian Standards)
- IS 2553 (Part 1) — Safety glass — architectural (Bureau of Indian Standards)
Frequently asked
Related
More in Facade & Glazing
- Facade Rain-Screen Ventilated Systems
- Spider Glazing — Routels, Glass Fins and Tie Rods
- Wall & Roof Insulation — PIR, Rock Wool and Envelope Panels
- Facade Access and Maintenance: Planning How the Building Gets Cleaned