Spider Glazing — Routels, Glass Fins and Tie Rods

Spider glazing is point-fixed structural glazing in which each toughened glass panel hangs from bolted spider fittings, carried by glass fins, stainless tie rods or a steel or aluminium frame behind. It suits entrances, atria and lobbies where maximum transparency is the aim, and uses heat-soaked glass with holes drilled before toughening.

By Dhruv Agarwal · · 2 min read

What we deliver

Point-fixed structural glazing using spider routels, with glass fins and tie rods as the supporting structure where the design calls for maximum transparency.

Spider glazing has the least margin for error of any glazing system on a project. Each panel hangs from four bolted points, holes are drilled before toughening and cannot be changed, and there is no frame to conceal a dimensional error. Everything has to be correct at fabrication.

Scope of works

StageWhat we deliver
DesignWind load to IS 875 Pt 3, glass thickness, fitting selection
Back-up structureGlass fin, tie rod or steel design and detailing
SurveyStructure surveyed before glass is ordered — holes are fixed
FabricationHole positions set, glass toughened and heat-soaked
InstallationFitting setting, articulation check, panel setting, sealing
HandoverWater testing, inspection, documentation

What drives the cost

Glass thickness, set by span and wind pressure · fitting type — countersunk routels cost more than standard bolts and give a flush face · whether the back-up is glass fin, tension rod or steel · panel size · height and access · heat soaking.

Where projects go wrong

  • Non-heat-soaked toughened glass. Nickel sulphide inclusions cause spontaneous breakage years later, over an occupied space.
  • Setting out from the building rather than the glass. Holes are fixed at fabrication; the structure must be surveyed and built to match.
  • Under-designed back-up structure. Spiders transfer the entire wind load into whatever is behind them.
  • Rigid fittings. Fittings must articulate, or bending moment is forced into a drilled hole — the weakest point in the panel.
  • Specifying it across a full elevation. High cost, weak thermal performance, difficult sealing.

Why Hagerstone

Facade engineering leadership — a Director with 25+ years in premium facade solutions, structural glazing and high-rise exterior execution, with a dedicated 20-member facade team.

100% in-house execution across curtain wall, spider glazing, cladding and fenestration, so the transition from a spider-glazed atrium into the surrounding facade is detailed by one team.

79+ quality checkpoints under ISO 9001 / 14001 / 45001 certification.

Standards referenced

Design wind pressure to IS 875 (Part 3). Architectural safety glass to IS 2553 (Part 1) — toughened for point-fixed applications, with heat soaking specified explicitly.

Standards referenced

Frequently asked

Entrances, atria, lobbies, showrooms and double-height feature elevations — anywhere maximum transparency is the point of the design. It is a poor choice for a whole building facade: cost per square metre is high, thermal performance is weaker than a curtain wall because the point fittings bridge the assembly, and sealing is harder. It works as a feature, not as a default.

Toughened, and it should be heat-soaked. The bolt holes concentrate stress at four points, which annealed and heat-strengthened glass cannot take. Heat soaking reduces the risk of spontaneous failure from nickel sulphide inclusions — a real consideration when panels hang over an occupied lobby. Holes are drilled before toughening; glass cannot be modified afterwards.

Something has to carry the wind load behind the glass. On modest spans that is a steel or aluminium structure. On tall atria it is usually glass fins — vertical glass beams — or a tension system of stainless tie rods and cables, which is what keeps the assembly visually light. We design the back-up structure as part of the package.

Related

More in Facade & Glazing

All Facade & Glazing →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback