Factories & Manufacturing — PEB, Civil, MEP and Envelope

Factory construction delivers a building around a manufacturing process: structure, civil works, insulated envelope, MEP and firefighting. Floor loads, clear heights, crane capacity and utilities come from the process layout, and the building has to be ready when the machinery arrives.

By Dhruv Agarwal · · 1 min read

What manufacturers need

A factory serves a process and a start-of-production date. The building has to match the process layout — floor loads, clear heights, crane capacity, utilities and ventilation — and it has to be ready when the machinery arrives.

What we deliver for industry

ScopeWhat it covers
PEB buildingsProduction sheds and warehouses
Industrial constructionAdmin blocks, foundations, floors
Roofing & claddingInsulated envelopes
Electrical HT/LTPlant power distribution
FirefightingHydrant, sprinkler, pump room

Delivered work

ProjectScope
Consern Pharma, Focal Point LudhianaIndustrial project
Auma India and MinebeaMitsumi, PeenyaManufacturing-adjacent projects

Facade leadership experience

Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering), has led delivery on projects including:

ProjectScope
Anygraphics Factory, NoidaPIR panel, rock wool panel and semi-unitised structural glazing, 6,500 sq. m.
Dee Development, BhujAdmin block glazing & ACP cladding, 25,000 sq. ft.

Why Hagerstone for industry

Single-partner execution across PEB, civil, MEP and interiors, with 15 welders, 15 fitters, a 35-member firefighting team and a 53-member site team in-house, under ISO 9001 / 14001 / 45001.

Standards referenced

Industrial occupancy fire and life safety under NBC 2016, Part 4. Steel design to IS 800:2007.

Standards referenced

  • NBC 2016, Part 4 — Fire and life safety — industrial occupancy (Bureau of Indian Standards)
  • IS 800:2007 — General construction in steel — code of practice (Bureau of Indian Standards)

Frequently asked

Yes. We deliver PEB production buildings, RCC admin blocks, insulated envelopes, electrical including HT/LT panels, firefighting and plant MEP, and office interiors — under one contract, so foundations, steel and services follow a single programme.

Yes. Hagerstone has worked across 25+ cities, including industrial locations such as Manesar, Rajpura, Dera Bassi, Kotputli, Nalagarh and Bhuj, as well as the Peenya industrial area in Bengaluru and the Focal Point estates in Ludhiana.

Related

More in Industries

All Industries →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback