Firefighting Systems — Hydrants, Sprinklers and Pump Rooms
Firefighting systems are the hydrants, hose reels, wet risers, automatic sprinklers and fire pump rooms that suppress a fire in a building. Pumps, tank and pipework are sized by hydraulic calculation from the occupancy's hazard classification and the systems installed, with reference to NBC 2016 Part 4, IS 15105 and IS 3844.
By Dhruv Agarwal · · 2 min read
What we deliver
Fire hydrant and hose reel systems, wet risers, automatic sprinklers, fire pump rooms and the associated piping — installed, pressure tested and commissioned.
This is life-safety work, and the standard it is held to is correspondingly higher. A sprinkler system is tested once properly and then, with luck, never used — which means whatever was wrong with it on day one is discovered on the worst day of the building's life.
Scope of works
| Stage | What we deliver |
|---|---|
| Assessment | Occupancy, hazard class and applicable requirements |
| Design | Layout, hydraulic calculation, pump and tank sizing |
| Pump room | Main, jockey and diesel pumps, valves, controls |
| Hydrants | Internal and yard hydrants, hose reels, wet risers |
| Sprinklers | Heads, range pipes, installation control valves |
| Piping | MS / GI piping, supports, painting and identification |
| Testing | Hydrostatic pressure test, flow test, commissioning |
| Handover | As-built drawings, test records, O&M documentation |
What drives the cost
Hazard classification · building height and floor area · whether sprinklers are required in addition to hydrants · pump capacity and the diesel standby · tank volume · pipe material and lengths · the number of enclosures on a fit-out, since each needs its own coverage.
Where projects go wrong
- Pump room space allocated before the calculation. The pumps and valves then do not fit, and the room is rebuilt.
- Sprinklers not reassessed after partitioning. Every enclosure needs its own coverage.
- Pressure testing rushed or skipped. The test is the only proof the system holds pressure; leaks found later are found in finished ceilings.
- Obstructions ignored. Ducts, beams and cable trays that block a sprinkler's spray pattern leave areas uncovered despite heads being present.
- No maintenance plan. Jockey pumps, valves and diesel engines need routine testing to still work when called on.
Why Hagerstone
A dedicated 35-member firefighting team — the largest single trade team in our organisation — plus 15 plumbers, 15 fitters and 15 welders, with pipe threading, cutting, bending and pressure testing equipment owned in-house.
Coordinated with interiors and MEP under one contract, so sprinkler rework on a fit-out is resolved on the drawing rather than discovered on site.
79+ quality checkpoints under ISO 9001 / 14001 / 45001.
Standards referenced
Fire and life safety requirements under NBC 2016, Part 4. Sprinkler design and installation to IS 15105. Internal hydrants and hose reels to IS 3844.
Standards referenced
- NBC 2016, Part 4 — Fire and life safety (Bureau of Indian Standards)
- IS 15105 — Design and installation of fixed automatic sprinkler systems (Bureau of Indian Standards)
- IS 3844 — Installation of internal fire hydrants and hose reels (Bureau of Indian Standards)
Frequently asked
Related
More in MEP
- Healthcare MEP — Hospitals, Clinics and Diagnostic Centres
- Low Voltage & ELV Systems — CCTV, Access Control, PA
- Networking & Structured Cabling
- Energy Metering and Monitoring: Measuring Before Managing