Plumbing & Drainage
Plumbing and drainage covers a building's hot and cold water supply, soil, waste and rainwater drainage, venting, sanitary fixtures and pumping. Most failures after handover come from drainage falls and venting rather than leaks, so correct falls, vents, compatible pipe materials and pressure testing are decided at installation.
By Dhruv Agarwal · · 1 min read
What we deliver
Cold and hot water supply, drainage and venting, sanitary fixtures, and pumping for offices, hotels, hospitals, factories and institutional buildings — installed, pressure tested and handed over.
Plumbing is the service nobody notices until it goes wrong, and when it does, it is usually concealed inside a finished floor or wall. The work that prevents that happens at installation: falls, venting, supports and testing.
Scope of works
| Stage | What we deliver |
|---|---|
| Design | Fixture schedule, water demand, pipe sizing, riser strategy |
| Water supply | Cold and hot water distribution, valves, meters |
| Drainage | Soil, waste and rainwater lines with correct falls |
| Venting | Vent stacks and branch vents |
| Fixtures | Sanitary ware, CP fittings, pantry and wet area connections |
| Pumping | Transfer and pressure boosting pumps where required |
| Testing | Pressure test on supply, water test on drainage |
| Handover | As-built drawings, test records |
Where projects go wrong
- Insufficient drainage fall. Slow drainage and blockages, discovered after the floor is finished.
- Venting omitted or undersized. Traps siphon, and the smell arrives in the occupied space.
- Pressure testing skipped. Leaks are then found in finished ceilings.
- Risers located late on a fit-out. Wet areas end up where drainage can reach, not where the layout needed them.
- Incompatible pipe materials at joints. A frequent and avoidable cause of failure.
Why Hagerstone
15 plumbers and 15 fitters in-house, with pipe threading, cutting, bending and pressure testing equipment owned rather than hired — and plumbing delivered alongside the interiors and firefighting it has to coordinate with.
79+ quality checkpoints under ISO 9001 / 14001 / 45001.
Standards referenced
Plumbing services under NBC 2016, Part 9. Basic requirements for water supply, drainage and sanitation to IS 1172.
Standards referenced
- NBC 2016, Part 9 — Plumbing services (Bureau of Indian Standards)
- IS 1172 — Code of basic requirements for water supply, drainage and sanitation (Bureau of Indian Standards)
Frequently asked
Related
More in MEP
- Energy Metering and Monitoring: Measuring Before Managing
- Server Room and Data Centre MEP: Cooling, Power and Resilience
- Building Management Systems: What a BMS Should Actually Deliver
- HVAC Systems Design: Load, Distribution, Fresh Air and Control