Healthcare MEP — Hospitals, Clinics and Diagnostic Centres

Healthcare MEP is the power, air, water and fire services for hospitals, clinics and diagnostic centres, across areas such as operation theatres, ICU, emergency and patient rooms. Unlike office MEP it is designed around redundancy, controlled air movement between zones and continuity of supply, because failures carry clinical consequences.

By Dhruv Agarwal · · 2 min read

What we deliver

Interiors and MEP for hospitals, clinics and diagnostic centres — across clinical, critical and public areas, with the services each zone actually requires.

Healthcare is where building services stop being about comfort and start being about continuity. The design question is not only whether a system works, but what happens to the patient in the room when it stops.

Areas we deliver

AreaWhat drives the services
Operation theatreControlled air movement and pressure, clean supply, uninterrupted power
ICU & critical careContinuity of power, air quality, monitoring interfaces
Emergency departmentHigh throughput, robust finishes, flexible power
Diagnostic & imagingEquipment loads, cooling, shielding coordination
Patient roomsComfort, nurse call interfaces, hygienic finishes
PharmacyControlled storage conditions
Consultation & OPDVentilation, circulation, patient flow
Physiotherapy & rehabOpen spaces, accessibility
Reception & waitingPublic-facing finishes, wayfinding, air quality

Where projects go wrong

  • Treating a hospital like a large office. The redundancy and zoning requirements are fundamentally different.
  • Critical areas without continuity of supply. Power and air to OT and ICU must survive a single failure.
  • Pressure relationships between zones not maintained. Air moving the wrong way between clean and dirty areas defeats infection control.
  • Live-facility work without infection-control barriers. Construction dust in a clinical area is a patient-safety issue.
  • Equipment requirements confirmed late. Imaging and theatre equipment bring specific power, cooling and structural needs that must be designed in.

Why Hagerstone

Interiors and MEP under one contract for healthcare, as set out in our Hospital Interior & MEP capability profile — so the finishes, the air and the power in a clinical space are designed together rather than negotiated between contractors.

Trades in-house: 35 firefighting, 15 HVAC, 15 electricians, 15 plumbers and a 53-member site team, under ISO 9001 / 14001 / 45001 with 79+ quality checkpoints. Our healthcare work includes the facade at Max Hospital, Saket.

For air conditioning and ventilation, see our HVAC services.

Standards referenced

Fire and life safety for institutional occupancy under NBC 2016, Part 4. Plumbing services under NBC 2016, Part 9.

Standards referenced

  • NBC 2016, Part 4 — Fire and life safety — institutional occupancy (Bureau of Indian Standards)
  • NBC 2016, Part 9 — Plumbing services (Bureau of Indian Standards)

Frequently asked

Because the consequences of failure are clinical, not just uncomfortable. A power interruption in an ICU, a pressure reversal in an operation theatre or a water supply issue in a sterile area affects patients directly. Hospital MEP is designed around redundancy, controlled air movement between zones, and continuity of supply to critical areas — none of which an office needs.

Yes, and much healthcare work is exactly that — expansions and upgrades in a live facility. It requires strict phasing, infection-control barriers between the work zone and clinical areas, dust and noise control, and shutdowns planned with the hospital around clinical schedules. It is slower and more expensive per square foot than new build, and the method matters as much as the design.

Our healthcare scope covers reception and waiting areas, emergency departments, patient rooms, operation theatres, ICU and critical care, diagnostic and imaging, pharmacy, consultation and OPD, and physiotherapy and rehabilitation — each of which has different requirements for air, power, water and finishes.