Low Voltage & ELV Systems — CCTV, Access Control, PA
Low voltage or ELV systems are the building services that run on signal cabling rather than mains power: CCTV, access control, public address and voice evacuation, intercom and building management interfaces. They work best designed with the fit-out, with dedicated containment and access-controlled escape doors wired to release on a fire alarm.
By Dhruv Agarwal · · 1 min read
What we deliver
CCTV, access control, public address and voice evacuation, intercom, and building management interfaces — designed with the building services and installed with the fit-out rather than bolted on afterwards.
Low voltage systems are small in cost relative to the building and large in how they affect daily use and safety. They are also the systems most often left to the end, which is why they so often end up in surface conduit across a finished ceiling.
Scope of works
| System | What we deliver |
|---|---|
| CCTV | Camera layout, coverage review, recording, cabling |
| Access control | Readers, locks, door release, controller, fire interface |
| Public address | Speakers, zoning, voice evacuation interface |
| Intercom | Reception and entry intercom |
| BMS interfaces | Integration points for HVAC, lighting and alarms |
| Containment | Dedicated ELV trays and conduits, rack space |
| Testing | Coverage check, interface tests, commissioning |
Where projects go wrong
- Access-controlled escape doors not released on alarm. A genuine safety failure, not a technical detail.
- Camera positions chosen without a coverage review. Blind spots at exactly the entrances and corridors that matter.
- ELV added after the ceiling closes. Cut ceilings and surface containment.
- No dedicated containment. ELV sharing trays with power invites interference and confusion at every future change.
- Rack space not planned. Equipment ends up in a cupboard with no ventilation.
Why Hagerstone
Low voltage is part of our stated MEP scope, delivered with the electrical, fire alarm and fit-out work it has to interface with — so the escape door release and the PA voice evacuation are tested against the fire alarm, not left between contractors.
15 electricians and 15 technicians in-house, under ISO 9001 / 14001 / 45001 and 79+ quality checkpoints.
Standards referenced
Fire alarm and PA interfaces under NBC 2016, Part 4. Wiring installation practice to IS 732.
Standards referenced
- NBC 2016, Part 4 — Fire and life safety — alarm and PA interfaces (Bureau of Indian Standards)
- IS 732 — Electrical wiring installations (Bureau of Indian Standards)
Frequently asked
Related
More in MEP
- Plumbing & Drainage
- Energy Metering and Monitoring: Measuring Before Managing
- Server Room and Data Centre MEP: Cooling, Power and Resilience
- Building Management Systems: What a BMS Should Actually Deliver