Aluminium Extrusion 6063-T6 for Facade Systems
6063-T6 is an aluminium alloy containing magnesium and silicon, solution heat-treated and artificially aged, and extruded into the profiles that carry glass, gaskets and hardware in a facade. It is chosen because it extrudes into complex thin-walled shapes with a good surface finish; wall thickness and finish class then decide how a given profile performs.
By Dhruv Agarwal · · 1 min read
What it is
The structural backbone of an aluminium facade: alloy 6063 in T6 temper, extruded into hollow and open profiles that carry glass, resist wind and hold the gaskets, hardware and drainage that make a window work.
Specification at a glance
| Property | Typical specification |
|---|---|
| Alloy and temper | 6063-T6 to IS 733 |
| Ultimate tensile strength | Approximately 215 MPa |
| Wall thickness | Stated explicitly, typically 1.4mm — 3.0mm |
| Anodising | Grade to IS 1868, thickness in microns |
| Powder coat | Resin class named; AAMA 2605 for PVDF |
| Straightness and twist | Tolerance stated on the order |
What to verify on a supply
- Wall thickness against the approved section, measured, not assumed
- Anodic coating thickness in microns — commonly 15 micron internal, 20–25 micron external, higher for coastal exposure
- Powder coat resin class on the certificate, not the colour name
- Temper certificate for the delivered batch
- Screw port dimensions, since hardware retention depends on them
Why the finish class decides service life
A polyester powder coat and a PVDF powder coat look identical on handover. On a south or west elevation in India, the polyester chalks and fades within a few years while the PVDF holds colour for well over a decade. The price difference at supply is modest; the difference in when the building needs recoating is enormous, and recoating an installed facade is scaffolding, access and disruption.
Where projects go wrong
- Wall thickness unstated, so the cheapest quote wins on a thinner section that deflects more and holds hardware worse.
- "Powder coated" with no resin class. Unenforceable.
- Anodising thickness unspecified for a coastal site.
- Mixing profile families across one facade, so gaskets and hardware no longer match the tested assembly.
- Dissimilar metal contact — steel fixings directly against aluminium without isolation set up galvanic corrosion at the interface.
Standards referenced
Alloy and temper under IS 733. Anodic coating grades under IS 1868. High-performance organic coating performance to AAMA 2605.
Standards referenced
Frequently asked
Related
More in Materials
- Aluminium Honeycomb Panel for Flat Facades
- Body Tinted Glass — Heat Absorbing Float
- Cable Tray Types — Ladder, Perforated and Wire Mesh
- Calcium Silicate Board for Fire and Wet Areas