EPDM Gaskets in Facade and Fenestration Systems
An EPDM gasket is an extruded ethylene propylene diene monomer rubber profile that seals glass to frame and frame to frame in aluminium windows and curtain walls. EPDM keeps its elasticity under UV and ozone where PVC hardens and stops sealing, and because systems are tested as complete assemblies, the specified gasket cannot be swapped for a look-alike.
By Dhruv Agarwal · · 2 min read
What it is
Ethylene propylene diene monomer rubber, extruded into profiles that seal glass to frame and frame to frame. It is the sealing element in almost every engineered aluminium fenestration and curtain wall system.
Small item, disproportionate consequence.
Specification at a glance
| Property | Typical specification |
|---|---|
| Material | EPDM, dense or sponge by function |
| Hardness | 60 — 70 Shore A typical for glazing |
| Classification | ASTM D2000 line call-out |
| Corners | Vulcanised, not cut and butted |
| Colour | Black standard; grey and white available |
| Service life | Decades under UV without embrittlement |
Why it outlasts the alternatives
EPDM's polymer backbone has no unsaturated bonds in the main chain, which is the technical reason it resists ozone and UV attack where other elastomers harden. In practical terms: an EPDM gasket on a west elevation in Delhi is still compressible after twenty summers. A PVC gasket in the same position is often hard and shrunken within five.
A hardened gasket does not seal. Water then enters the glazing rebate, attacks the DGU secondary seal, and the unit fogs.
Where it sits in the system
| Location | Function |
|---|---|
| Glazing rebate, inner and outer | Seals glass to frame, allows movement |
| Frame to frame joints | Seals the assembly line |
| Drainage path | Shaped to keep the rebate drained, not dammed |
| Compression seal on openable sashes | Air and water tightness when closed |
Where projects go wrong
- Cut and butted corners on a system that was tested with vulcanised ones.
- Gasket substitution at supply stage, voiding the tested performance.
- Over-compression, which takes a permanent set and leaves the seal slack.
- Stretching gaskets during installation. A stretched gasket recovers over months and pulls back from the corners, opening a gap at exactly the point water collects.
- Blocked drainage. A gasket seated wrongly can dam the rebate instead of draining it.
Standards referenced
Rubber material classification under ASTM D2000. Assembly air leakage to ASTM E283 and water penetration to ASTM E331, both of which are tested with the specified gasket in place.
Standards referenced
- ASTM D2000 — Rubber products in automotive and industrial applications (ASTM International)
- ASTM E283 — Air leakage through exterior windows and curtain walls (ASTM International)
- ASTM E331 — Water penetration of exterior windows and curtain walls (ASTM International)
Frequently asked
Related
More in Materials
- Epoxy Flooring — Coatings, Self-Levelling and Screeds
- Expanded Polystyrene (EPS) Insulation and Core
- Extruded Polystyrene (XPS) Insulation Board
- Fibre Cement Board for Facade and Interior Use