Perforated Metal Facade Screens and Solar Shading

A perforated metal facade screen is sheet metal, usually aluminium, punched with a repeating pattern of holes and formed into panels or cassettes hung in front of glazing or a solid wall for shading, screening and appearance. Its key variable is the open area percentage, which trades solar shading against view and daylight.

By Dhruv Agarwal · · 1 min read

What it is

Sheet metal — usually aluminium, sometimes stainless or weathering steel — punched with a repeating pattern of holes and formed into panels or cassettes, hung in front of glazing or a solid wall.

It does three jobs at once: shading, screening and appearance.

Specification at a glance

PropertyTypical specification
MaterialAluminium to IS 737, or stainless / Corten
Thickness2mm — 4mm typical for panels
PerforationRound, square, slot, or bespoke pattern
Open areaStated as a percentage — the key variable
Edge marginUnperforated border for stiffness and fixing
FinishPVDF powder coat or anodised

What the screen achieves

Solar shading without blocking the view. Because the screen sits in front of the glass with a gap, it intercepts direct sun before it reaches the glazing, while occupants still see out through the perforations.

Glare control on east and west elevations where low sun defeats overhangs.

Privacy at close-facing elevations, working in one direction because of the brightness difference between inside and outside.

Plant and car park screening, concealing equipment while allowing the ventilation those spaces need.

Where projects go wrong

  • Open area chosen visually, not against sun path and daylight needs.
  • Wind load assumed negligible because the panel is perforated.
  • No unperforated margin, so the panel has no stiffness at its edges and distorts at the fixings.
  • Panels rotated on site where the perforation pattern or image has a defined orientation.
  • Cleaning and maintenance access not considered. A screen in front of glass makes the glass much harder to clean, and that has to be planned.

Standards referenced

Aluminium sheet under IS 737. Shading and SHGC provisions under ECBC 2017. Wind loading on cladding and screens under IS 875 (Part 3).

Standards referenced

  • IS 737 — Wrought aluminium alloy sheet and strip (Bureau of Indian Standards)
  • ECBC 2017 — Building envelope — shading and SHGC (Bureau of Energy Efficiency)
  • IS 875 (Part 3) — Wind loads on buildings (Bureau of Indian Standards)

Frequently asked

It is the key variable and it trades shading against view and daylight. Roughly 20 to 30 percent open gives strong solar shading and privacy while remaining visually open from inside; 40 to 50 percent lets through more light and view with less shading benefit. It should be chosen per elevation against the sun path rather than applied uniformly around the building.

They reduce it compared with a solid panel of the same size, but they do not eliminate it, and the reduction is not simply proportional to open area. Wind load on a perforated screen and on the structure behind it must be assessed properly under IS 875 Part 3. Treating a screen as weightless because it has holes in it is a structural error, particularly at height.

Yes. Varying hole size and spacing across a panel reproduces a gradient or an image that reads at distance and dissolves into pattern close up. It is a common feature treatment on car park facades and institutional buildings. It costs more because the tooling and programming are bespoke, and panel orientation becomes critical since a rotated panel breaks the image.

Related

More in Materials

All Materials →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback