Low-E Glass: Coated Glass That Controls Heat

Low-E — low-emissivity — glass carries a microscopically thin metallic coating that reflects heat radiation while letting visible light through. It reduces heat transfer through the glass, and solar-control variants also cut the sun's heat gain — which is what matters most in hot Indian climates.

By Dhruv Agarwal · · 1 min read

Why it matters

Glass is usually the weakest part of the envelope thermally. A low-E coating changes that without making the glass dark, which is why it is central to meeting ECBC targets while keeping daylight.

How it works in practice

TypeHow appliedUse
Soft-coatVacuum deposition after manufactureInside DGUs, best performance
Hard-coatFused during manufactureSingle glazing, durable
Solar-control low-ESoft-coat tuned to block solar heatHot climates

Common mistakes

  • Using soft-coat in single glazing. The coating is exposed and degrades.
  • Coating on the wrong surface. Performance changes significantly.
  • Choosing on appearance only. Check SHGC, U-value and light transmission.

Standards referenced

Fenestration performance under ECBC 2017. Safety glass under IS 2553 (Part 1).

Standards referenced

  • ECBC 2017 — Building envelope — fenestration (Bureau of Energy Efficiency)
  • IS 2553 (Part 1) — Safety glass — architectural (Bureau of Indian Standards)

Frequently asked

Soft-coat low-E is applied in a vacuum after the glass is made; it performs better but is fragile, so it must be sealed inside a double glazed unit. Hard-coat is fused onto the glass during manufacture; it is tougher and can be used in single glazing, but performs less well.

For solar control in a cooling climate, the coating usually sits on surface 2 — the cavity-facing side of the outer pane — so solar heat is reflected before it enters the cavity.

Related

More in Glossary

All Glossary →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback